Similar Projects
Scheduled and Emergency Drainage System Repairs and Improvements at Various Locations
Bidding
Less than $2,176,397 est. value

Removal and Replacement of 46 Existing Culverts
Post-Bid
Less than $17,400,000 est. value

Wilbraham Road Headwall Repairs
Post-Bid
Less than $127,917 est. value
Monson, MA

Brookmont Dr. Drainage Culvert Replacement 2018
Results
Less than $25,000 est. value
Wilbraham, MA

Drainage Repairs and Related Work at Various Locations
Results
Less than $367,300 est. value

Flood Control Works - Phase III Repair Program
Post-Bid
Chicopee, MA 01013

Bagg Brook Restoration Project - Phase I
Results
Less than $280,000 est. value
West Springfield, MA 01089

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Results
Less than $823,775 est. value

Slope Improvements and Related Work at BR. No. C-13-039=H-21-059 Interstate 391 over the Connecticut River
Results
Less than $459,635 est. value
Chicopee, MA

Granville Road Culvert Replacement Project
Results
Less than $450,000 est. value
Southwick, MA 01077

Scheduled and Emergency Catch Basin and Pipe Cleaning at Various Locations
Results
Less than $183,000 est. value

Kinnebrook Road Culvert Replacement
Results
Chester, MA

Birnie Avenue Culvert Headwall Replacement
Results
$327,000 est. value
West Springfield, MA 01089

Powder Mill Middle School Drainage Improvements
Results
Southwick, MA 01077

Culvert and Drainage Repairs and Improvements at Various Locations along Interstate 90
Results
Less than $2,038,440 est. value

Reported 04/10/2019 12:00 AM
Project Title

First Level Canal Wall Repairs - Cabot Street

Physical Address View project details and contacts
City, State (County) Holyoke, MA   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. Partial demolition/removal of the upper section of the existing masonry canal wall near Cabot St. along the first level canal to include removal of approximately the upper four feet of dry laid masonry wall, down to sound material for a distance of approximately 150 linear feet. The new wall will be reconstructed using mortar in all new joints so as to more permanently secure the wall. Installation of protective fences and paving repairs as needed to restore the area to its original condition.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents