Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

Microsurfacing
Infrastructure
Bidding
$160,657 est. value
Clinton, IA

700 blocks South 3rd Street and South 4th Street Reconstruction
Infrastructure
Post-Bid
Clinton, IA 52732

Microsurfacing
Infrastructure
Results
IA

Fog Seal
Infrastructure
Results
IA

Asphalt Street Overlay
Infrastructure
Results
Clinton, IA

Camanche 2021 Street Improvements Phase 3
Infrastructure
Results
Camanche, IA 52730

Mill Creek Parkway Concrete Patching
Infrastructure
Results
Clinton, IA 52734

Fog Seal
Infrastructure
Results
IA

South 10th Street Sewer Separation
Infrastructure
Results
Clinton, IA 52732

South Clinton Sewer Separation
Infrastructure
Results
IA

PCC Patching
Infrastructure
Results

Fog Seal
Infrastructure
Results
Clinton, IA

PCC Patching
Infrastructure
Results

Asphalt Street Rehabilitation
Infrastructure
Results
Clinton, IA 52732

Last Updated 05/03/2022 12:41 AM
Project Title

Asphalt Street Rehab: 22nd Avenue and Pershing Boulevard Details

Physical Address View project details and contacts
City, State (County) Clinton, IA 52732   (Clinton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $555,849
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project J-2022 will consist of asphalt removal and resurfacing of 22 nd Avenue North (from North 3 rd Street to North 10 th Street), and Pershing Boulevard (from 18 th Avenue North to Main Avenue). The project also includes curb & gutter construction, full depth concrete patching, removal and stabilization of sub-grade, reconstruction of sidewalks and ADA curb ramps, replacement of storm sewer infrastructure, along with other appurtenances associated with heavy highway construction along these routes according to the plans on file.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents