Similar Projects
Smith Academy For Excellence Renovation
Renovation - 60,000 SF
Design
$12,000,000 est. value
Fort Wayne, IN 46806

Homestead High School Phase 2B
Renovation, Addition
Post-Bid
Fort Wayne, IN 46814

FWCS: CMc Services for Renovation, and Accessibility and Security Improvements
Renovation
Post-Bid
Fort Wayne, IN 46819

Annex and Administration Building
Renovation
Results
New Haven, IN 46774

Expansion and Renovation of Levan R. Scott Academy
Renovation, Addition
Results
$11,600,000 est. value
Fort Wayne, IN 46806

Electric Works Broadway | District
New Construction - 700,000 SF
Construction
$286,000,000 est. value
Fort Wayne, IN 46802

Ashberry - Metro West Mixed Use
New Construction - 69,500 SF
Construction
$43,400,000 est. value
Fort Wayne, IN 46802

Schoolhouse Lofts
New Construction - 4,800 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Fort Wayne, IN 46804

Premier Truck Headquarters Expansion
Addition - 24,000 SF
Pending Verification
$4,900,000 est. value
Fort Wayne, IN 46809

Homestead High School Phase 3A
Renovation, Addition
Post-Bid
Fort Wayne, IN 46814

Wayne High School Softball Field Renovation
Renovation
Results
Fort Wayne, IN 46819

Office Building and Coffee Shop
New Construction - 6,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fort Wayne, IN

Homestead HS - Phase 3B East - Roofing & Elevator
Renovation, Addition
Post-Bid
Fort Wayne, IN 46814

New Haven HS Stadium Ticket Booth
New Construction
Results
$400,000 est. value
New Haven, IN 46774

Riverfront at Promenade Park Mixed-Use Development
New Construction
Construction
$88,700,000 est. value
Fort Wayne, IN

Last Updated 06/01/2022 08:44 AM
Project Title

Carroll Freshman Center Office Build-Out

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46818   (Allen County)
Category(s) Commercial, Education
Sub-Category(s) Middle/Senior High School, Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Projects consist of work necessary to renovate and buildout offices at the Carroll Freshman Center.

Details

Office, Build-Out, Middle/Senior High School, Build-Out.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Furniture, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents