Similar Projects
Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria
Infrastructure
Conception
$5,450,000 CJ est. value
Peoria, IL 61603

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Culvert Replacement for East Branch of Dry Run Creek at West Merle Lane
Infrastructure
Bidding
$300,000 CJ est. value
Peoria, IL 61604

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Sealcoating
Post-Bid
Peoria Heights, IL

Illini Bluffs Saylor Street Parking Lot Phase 1
Results
Less than $211,770 est. value
Glasford, IL 61533

Asphalt Path Replacement at Rock Island Greenway
Results
Peoria, IL

ADA Sidewalk
Post-Bid
Chillicothe, IL

Repair Privately-Owned Vehicle Parking Lot
Results
Less than $1,500,000 est. value
Bartonville, IL 61607

Seal Coat
Alteration
Post-Bid
Princeville, IL

Crack and Joint Sealing at Various Locations in Knox, Peoria, and Tazewell Counties
Results

2021 North Valley Sidewalk Improvements
Alteration
Post-Bid
Peoria, IL

Construction of Rock Island Trail Extension
Results
Peoria, IL 61603

Second Street ADA Sidewalk
Infrastructure
Post-Bid
Chillicothe, IL 61523

Last Updated 08/16/2022 03:06 PM
Project Title

Hollis Grade School North Parking Lot Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Peoria, IL 61607   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $338,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 16, 2022, no bids were received. No definite date for the rebid. All bidders are hereby advised that they must be able submit, if requested by the Owner, an Illinois Department of Transportation Pre-qualification Statement for this Project prior to opening of Bids. Bids will be held good and may not be withdrawn for a period of 60 calendar days from due date. It is anticipated the Board of Education will be acting on the bid Tuesday July 19th, 2022. Every bid shall consist of two (2) completed copies of Bid Documents and shall be accompanied by bid guarantee consisting of Bid Bond, Certified Check, or Bank Draft made payable to Hollis Consolidated School District #328, in an amount equal to and not less than ten percent (10%) of total of bids upon which Contractor is bidding. Failure of bidder to submit Bid Bond, Certified Check, or Bank Draft in amount to cover proposal(s) being bid upon is cause for rejection of this bid. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Commencement of the work may begin as early as July 20th, 2022 pending the contractor's submittal of an executed contract along with the submittal of the required insurance certificate(s), bond(s), and any other miscellaneous documents. The Owner reserves the right to waive any irregularities and to accept any or reject all bids when in the opinion of the Owner, such action will serve the best interest of the Owner. Drawings and Specifications are on file for reference at the following locations: Greater Peoria Contractors & Suppliers, 1811 W Altorfer Dr., Peoria, IL 61615.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents