Similar Projects
T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

The Other Place Office Development / Belton
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Belton, MO 64012

Pavement Marking
Infrastructure
Bidding
$2,500,000 CJ est. value
Harrisonville, MO 64701

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Highway 58 Waterline Replacement
Infrastructure
Results
$313,900 CJ est. value
Raymore, MO 64083

Job Order Contracting for Pavement Repair
Infrastructure
Results
$50,000 to $100,000 est. value

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Good Parkway Improvements - 26-PRK-001 - City of Raymore
Infrastructure
Conception
$580,000 CJ est. value
Raymore, MO 64083

2022 Parking Lot Improvements
Infrastructure
Post-Bid
$200,000 est. value
Belton, MO

Corner Repair FY21-22 - Citywide ADA 3
Infrastructure
Results

The Depot / Raymore
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Raymore, MO 64083

Stormwater Culvert Rehabilitation - 22-STM-003 - City of Raymore
Infrastructure
Conception
$1,060,000 CJ est. value
Raymore, MO 64083

Last Updated 05/23/2023 10:40 AM
Project Title

2023 Sidewalk and Curb Program

Physical Address View project details and contacts
City, State (County) Harrisonville, MO 64701   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $73,634 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 23, 2023, project was awarded to Terry Snelling Construction, awarded amount is $73,633.59.** The work under this Contract consists of the following: Contractor providing the labor, materials, and equipment to remove and replace concrete ADA ramps, sidewalks, driveway approaches, curbs, and gutters at various locations and as detailed herein including mobilization, traffic controls, grading, and site restoration. Direct all questions to Rodney Jacobs, Superintendent of Streets, 816-380-8951, rjacobs@harrisonville.com

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents