Similar Projects
Valve Assessment Program
Post-Bid
Elmhurst, IL

2021 Street Improvement
Post-Bid
Bloomingdale, IL

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

2021 GM Roads Program
Post-Bid
West Chicago, IL

Sidewalk
New Construction
Results
Less than $261,687 est. value
IL

HMA Surface Removal
Post-Bid
Wood Dale, IL

2021 Paving
Results
Clarendon Hills, IL

Utility and Roadway Improvements Project 20001 Phase 1
Post-Bid
Glen Ellyn, IL

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

2021 Hardscape Improvements
Post-Bid
Aurora, IL 60504

Sunnyside Road, Pierce Avenue, Bryn Mawr Avenue and Sycamore Avenue Water Improvement
Results
Roselle, IL

2021 Sidewalk and Concrete Street Repair Program
Post-Bid
Glen Ellyn, IL

2021 Street Resurfacing ST-004(B)
Results
Downers Grove, IL

Oak Brook Sports Core Improvements
Post-Bid
Less than $450,000 est. value
Oak Brook, IL

Last Updated 09/14/2022 09:31 AM
Project Title

Otis / Florence / Grant Drainage Improvements

Physical Address View project details and contacts
City, State (County) Downers Grove, IL 60515   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $661,351 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 14, 2022, project was awarded to Mauro Sewer Construction awarded amount is $661,350.90** The Otis/Grant/FlorenceStorm SewerImprovementsProject shall generally consist of the following: oConstruction of approximately 1260linear feet of 12", 15", 18", 24" and 36"storm sewer. oFull reconstruction of approximately 360square yards of hot-mix asphalt roadway. oMill and overlay of approximately 3,600square yards of hot-mix asphalt roadway. oConstruction of approximately 2,100square feetof sidewalk. oAll other collateral work such as driveway replacements, curb and gutter replacementsand restoration. This package can be downloaded from Corporation on our website. Note: all prospective bidders/respondents are hereby cautioned not to contact any member of the village of downers grove staff or officials other than the specified contact person. The Village Council reserves the right to accept or reject any and all bids/proposals, to waive technicalities and to accept or reject any item of any bid/proposal.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents