Similar Projects
Centennial Olympic Park Granite Project
Infrastructure
Bidding
$300,000 est. value
Atlanta, GA 30313

Cheshire Bridge Sidewalk Replacement
Infrastructure
Bidding
Atlanta, GA 30324

Creek Walk Connector Trail
New Construction
Post-Bid
GA 30324

Lower Dixie Lake Road Sidewalk Improvements
Infrastructure
Post-Bid
Union City, GA

Dunwoody Club Sidewalk
Results
Sandy Springs, GA

Buice Road Trail Project
Results
Less than $798,855 est. value
Johns Creek, GA

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Washington Road at Ale Circle Intersection
Infrastructure
Bidding
$600,000 est. value
East Point, GA 30344

Asphalt Trail and Drainage Projects
Infrastructure
Post-Bid
Milton, GA

Peachtree Dunwoody at Telford Place Roadway Improvement Project
Results
Sandy Springs, GA 30328

Roosevelt Highway (Sr 29) Sidewalk Extension
Infrastructure
Bidding
$80,000 est. value
Union City, GA

Birmingham Equestrian Parking Improvements
Infrastructure
Post-Bid
Alpharetta, Milton, GA 30004

Old Alabama Trail Project
Results
Johns Creek, GA

Amana Academy North Fulton Campus
Renovation, Alteration
Bidding
$575,000 est. value
Alpharetta, GA 30009

Reported 05/18/2022 12:00 AM
Project Title

East Campus Streetscapes

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30332   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $13,800,000
Plans Available from Selected Bidders - 03/01/23
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes three focus areas and construction zones: • Techwood Drive Cycle track - Cycle track and pedestrian sidewalk improvements linking to the Ferst Drive cycle track improving the Ferst/Techwood intersection while providing protected LIT infrastructure to a significant portion of Freshmen housing. • 4th Street South – Improvements to pedestrian sidewalks and entry/exit to Peters Parking deck to provide ADA compliant parking to Bobby Dodd Stadium and significantly improve the safety of 4th Street at the north entrance to the deck. • 4th Street North – Improvements to pedestrian sidewalks and surface lots within the Greek sector, enhancing the safety and access to the Greek, student life and religious organizations along this corridor. This effort also includes improvements to the north side of 3rd street in anticipation of a potential future opening of the 3rd Street tunnel.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents