Similar Projects
HVAC Maintenance Services
Term Contract
Design
Annapolis, Baltimore, College Park, Laurel, Owings Mills, MD - Leesburg, Springfield, Warrenton, VA

HVAC Equipment & Parts
Term Contract
Sub-Bidding
Millersville, MD 21108

HVAC Maintenance and Repairs for MDTA Facilities
Term Contract
Post-Bid
Annapolis, Baltimore, Bel Air, Derwood, Dundalk, Elkton, Laurel, Newburg, Perryville, MD 21226

Philip Merrill Center Heat Pump Replacements
Alteration
Post-Bid
Annapolis, MD 21403

On-Call HVAC Services - Rehab Maintenance
Term Contract, Alteration
Results
Baltimore, MD

HVAC Replacement for I-95 NB Welcome Center
Alteration
Results
Less than $50,000 est. value
Laurel, MD 20723

Service Maintenance and Support for Philips Ingenia 3T MRI Scanner and Associated Chiller and Uninterruptable Power Supply (UPS)
Term Contract
Post-Bid
Baltimore, MD 21225

Ventilation System Improvements Taylor Avenue Fire Station
Alteration
Results
Annapolis, MD 21401

Refrigeration Equipment & Install
Term Contract
Post-Bid
Curtis Bay, MD 21226

HVAC Asset Replacement IDIQ
Alteration
Results
Less than $7,000,000 est. value
Accokeek, Gaithersburg, Germantown, Hyattsville, Laurel, Potomac, Silver Spring, Temple Hills, Upper Marlboro, MD 20781

Heating and Air Conditioning System Inspection, Testing & Maintenance Service
Term Contract
Post-Bid
Baltimore, MD 21229

C537899 - CFSU-3 HST HVAC Renovation
Alteration
Results
$1,863,752 est. value
MD

Remove and Replace HVAC Units
Term Contract
Post-Bid
$700,000 est. value
Laurel, MD 20708

Chilled Water Pump 2 and Hot Water Pumps 1 and 2 at Miller Senate Building
Alteration
Results
Less than $100,000 est. value
Annapolis, MD 21401

On Call HVAC Work for Maryland State Highway Administration Hanover MD Complex
Term Contract
Post-Bid
Hanover, MD 21076

Last Updated 06/30/2023 03:06 AM
Project Title

Student Center Chiller Replacement

Physical Address View project details and contacts
City, State (County) Millersville, MD 21108   (Anne Arundel County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction with Installation Floater Bid Deposit Required: 5% of Bid Price Payment and Performance Bonds Required: 100% of Bid Price QUESTIONS DUE DATE AND TIME: July 18, 2023 12:00 Noon Questions must be received by the date and time noted above via email to: Dave Pyle at dpyle@harford.edu SCOPE OF WORK AND SPECIFICATIONS This project involves the removal and disposal of existing air-cooled chiller at the Student Center. Replacement shall be with equipment similar to existing 330T York model YCAS0330C46. The current unit has R-22 refrigerant and must be properly disposed of. Contractor will be responsible for all labor and materials required to remove and install the new chiller and connect all required items to chiller in existing location on pad. Any request for replacing the chiller with an approved equal shall be submitted before or by the solicitation question due date. No request for "approved equals" will be accepted after the solicitation questions due date of July 18, 2023. Project "construction" cannot begin prior to October 30, 2023 and shall be completed no later than March 31, 2024. Liquidated Damages will be assessed at $350.00 per day beyond the completion date or March 31, 2024, whichever date is the earliest. Bids submitted with completion dates beyond the March 31, 2024 date shall be rejected. A. The Campus will be in operation during the construction period. The selected firm shall provide traffic control at all times and insure a safe working environment. Project sites shall be kept clean, neat and organized. All work sites shall beenclosed in orange plastic safety fence. It is the Contractor's responsibility for removal and replacement of signs to facilitate work. Restoration of any damage to the College's property (buildings/grounds) will be the Contractor's responsibility. B. Mobilization, set up of contractor equipment, parking, dumpsters etc. shall be coordinated with the College's representative at the pre-construction meeting. C. The Contractor shall: 1. Provide a 24-hour emergency contact phone number. 2. Provide a project schedule at the pre-constructionmeeting. 3. A qualified, English-language speaking superintendent on the project premises at all times. Any change in supervision shall be communicated to the College's Project Manager immediately. 4. Attend progress meetings during the course of theproject. 5. Any RFI's or issues shall immediately be brought to the attention of the College's Project Manager. 6. A two-year (2) Contractor's workmanship warranty to the College priorto final payment that shall cover any issues resulting from the construction. 7. Any required equipment training shall be scheduled and provided by the contractor prior to final acceptance.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents