Similar Projects
Cheder Bnei Torah School Addition
New Construction, Addition
Design
Lakewood, NJ 08701

Historic William Allen School Rehabilitation
Renovation
Design
Burlington, NJ

Westfield High School Courtyard Renovations - Phase 2
Renovation
Bidding
Westfield, NJ 07090

Partial Facade Renovation at the Ocean City Intermediate School
Renovation
Bidding
$180,000 est. value
Ocean City, NJ 08226

Construction Management Services
Post-Bid
Secaucus, NJ 07094

Cape May County Technical School District Administration Building
Post-Bid
Cape May Court House, NJ 08210

Addition, Alterations and Renovations at Northern Burlington County Regional High School - Phase 3
Renovation
Results
$15,480,000 est. value
Columbus, NJ 08022

Building Additions and Interior Renovations to Columbus, Franklin, Roosevelt and Washington Schools
Renovation, Addition - 27,009 SF
Results
Less than $12,500,000 est. value
Lyndhurst, NJ 07071

Additions, Alterations and Renovations at Northern Burlington County Regional High School - Phase 2
Renovation
Construction
$925,000 to $10,750,000 est. value
Trenton, NJ 08618

2020 Winslow Township School District Improvements - Middle School Greenhouse, District Office Renovations and New Parking Area
Renovation
Construction
$2,065,800 est. value
Atco, NJ

New Field House and Site Improvements at North Plainfield High School
Infrastructure
Bidding
North Plainfield, NJ

Hackensack Schools Energy Savings Plan
Renovation
Post-Bid
Hackensack, NJ 07601

Facility Upgrades at Belleville Middle School
Results
$2,700,000 est. value
Belleville, NJ

Junior High School Project
Construction
Carteret, NJ 07008

Stabilization of the Manitou Park Schoolhouse
Renovation
Bidding
Bayville, NJ

Last Updated 02/22/2022 12:02 PM
Project Title

Health Monitoring Area at Hamburg School

Physical Address View project details and contacts
City, State (County) Hamburg, NJ 07419   (Sussex County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the installation of a new wall to subdivide the existing vestibule into a health monitoring area for practice of health and check-in protocols and an internal corridor; The new wall will contain an "Egress Only" door for use during school events; An adjacent opening will also be created into the existing corridor to allow for internal circulation from the school to the gymnasium and cafeteria; All infrastructure (power, life safety, etc.) will be updated as required.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents