Similar Projects
Pond and Drainage System Construction
Bidding
De Pere, WI

Academy Parking Lot Reconstruction
Bidding
Less than $270,000 est. value
Fort McCoy, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Streetscape Materials
Post-Bid
Milwaukee, WI 53202

City Owned Parking Lot Rehabilitation - East Lawn Cemetery
Results
Beloit, WI 53511

Motor Vehicles Storage Compound Expansion
Results
$700,000 est. value
Mosinee, WI 54455

Commercial Street Reconstruction
Bidding
Bangor, WI 54614

Parking Lot Renovation
Post-Bid
Milwaukee, WI 53205

Privately Owned Vehicle Parking Improvements - MEP Bidders
Results
$878,000 est. value
Marshfield, WI

Wisconsin Avenue Sidewalk
Bidding
Grand Chute, WI

Sidewalk and Curb Replacement
Post-Bid
$5,000 est. value
Winter, WI 54896

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

Lakeview Drive and Beach Drive Ditch Reconstruction Project
Bidding
Lake Ripley, WI 53523

Culverts
Term Contract
Post-Bid
WI

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Last Updated 03/24/2021 10:57 AM
Project Title

Site Utility Distribution System Replacement - Phase 1

Physical Address View project details and contacts
City, State (County) Menomonie, WI 54751   (Dunn County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of approximately 1200 lineal feet of new direct buried steam and condensate pipes (including two Broadway Street crossings), two new steam pits, approximately 130 lineal feet of new electrical ductbank, removal of existing steam box conduit, pipes, and pits, associated surface demolition and reconstruction, including electrical and lighting, retaining wall, asphalt parking lot, concrete roadway, sidewalk, sod and signing. Project includes traffic control (detour and lane closure) along Broadway Street (also STH 25/STH 29).

Details

Division 26 - Electrical.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents