Similar Projects
Skunk Hollow Pond for Regional Downtown Area - STM 18 - City of Littleton
Infrastructure
Conception
$500,000 CJ est. value
Littleton, CO 80122

Rangeview Gulch Detention - STM 02 - City of Littleton
Infrastructure
Conception
$700,000 CJ est. value
Littleton, CO 80120

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

Living Water Express Car Wash
New Construction, Infrastructure
Design
$750,000 CJ est. value
Aurora, CO 80012

Eastpark 70 Building 7 / Aurora
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Aurora, CO 80011

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

17-Mile House Utility Improvement
Infrastructure
Results
$100,000 to $200,000 est. value
CO

On-Call Construction Services for Emergency On-Call Water Pipeline Repair
Infrastructure
Results
Englewood, CO

Englewood Station Apartments
New Construction, Infrastructure
Construction
$83,000,000 CJ est. value
Englewood, CO 80110

Prose Murphy Creek
New Construction, Infrastructure
Construction
$127,000,000 CJ est. value
Aurora, CO 80018

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

King Soopers Fuel at Arapahoe Crossing
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

DA Office Pavement Mill and Overlay/C&G Replacement - Arapahoe County
Infrastructure
Conception
$250,000 CJ est. value
Centennial, CO 80111

Centennial Medical Plaza Center
New Construction, Renovation, Infrastructure - 61,000 SF
Design
$20,000,000 CJ est. value
Centennial, CO 80112

Last Updated 04/12/2023 05:44 PM
Project Title

2023 Water System Improvement Project

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Acceptance Deadline 02/21/2023 04:00 PM EST Questions are submitted online No The Work to be performed under the 2023 Water System Improvement Project consists of furnishing all labor, materials equipment, tools, supplies including the installation of new water line replacement/lining which covers approximately 11,000 LF of 6" & 8" diameter water distribution lines including valves, fittings, fire hydrants, and residential & commercial water service line re-connections at locations within the City of Aurora. Replacement Area 1 - 11th Ave (Del Mar Pkwy to Nome St) - 1,100 ft This section contains 6" Cast Iron Pipe built in the 1950s. This line has/had multiple breaks over the years. This pipeline is in a vicinity of a school and other critical facilities. Note: This section will only entail 700 lf+/- of R&R between (Del Mar & Jamaica) and then involve cross street tie-ins only between Jamaica & Nome St. Replacement Area 2 - Montview Blvd (From Havana to Peoria) - 4,221 ft This is a 6" CIP line that was built in the 1950s. It runs through a busy road and next to a school among other critical and commercial facilities. This line had multiple complicated breaks in the past. Replacement Area 3 - 25th Ave (From Havana to Peoria) - 5,751 ft This is an 8" CIP line that was built in the 1950s. It runs through a busy road and in vicinity of commercial properties as well as new development The opinion of probable cost for the Work is estimated to be between $6,500,000 and $7,000,000. All questions shall be submitted in writing to John Bruneau, Project Manager, via email at jbruneau@auroragov.org AND Nathan Jones, Contract Administrator, via email at njones@aurora.gov.org. Telephone inquiries will be accepted only for procedural questions by calling Nathan Jones at 303-739-7343. Questions are due by 2:00 p.m., local time, February 21, 2023. Responses will be posted via addendum posted to BidNet.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents