Similar Projects
Guaranteed Savings Contract
Alteration
Bidding
Indianapolis, IN

Signal and Lighting Improvements at the Intersection of 10th Street and Cossell Road
Infrastructure, Alteration
Bidding
$220,000 est. value
Speedway, IN 46224

Mechanical & Electrical System Services
Post-Bid
Crane, IN 47522

Emergency Lighting and Communication Equipment Installation
Term Contract
Post-Bid
Indianapolis, IN 46204

Valparaiso TOD Electrical
Results
Valparaiso, IN 46383

Bl044 McCalla- Modification Of Incoming Electrical Service
Results
Bloomington, IN 47408

Guaranteed Energy Savings Contract
Alteration
Bidding
Crawfordsville, IN

Preventative Maintenance for the Emergency Generators
Term Contract
Post-Bid
Less than $150,000 est. value
Indianapolis, IN 46201

WTP Switchgear Improvements
Results
Evansville, IN 47708

Light Fixture Replacement
Alteration
Bidding
$175,000 est. value
Munster, IN 46321

FMS 6 Terre Haute FMS 8 Stout Field OV Energy Conservation
Post-Bid
Less than $150,000 est. value
Evansville, IN 47715

Hammond Central High School - Technology and Black Box AV Systems
Renovation
Results
Hammond, IN 46320

Guaranteed Savings Contract
Alteration
Bidding
Merrillville, IN

Portable Light Tower
Post-Bid
Indianapolis, IN 46077

Deer Hollow Lift Station Improvements
Results
Fort Wayne, IN 46802

Last Updated 10/04/2021 09:20 AM
Project Title

Tipsaw - Goldenrod Group Shelter and Electrification Hoosier National Forest

Physical Address View project details and contacts
City, State (County) Tell City, IN   (Perry County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Part 1 - GENERAL REQUIREMENTS - Goldenrod Group Shelter This 16 x 22’ shelter shall be constructed on a reinforced concrete slab with piers supporting the structures 8”x8” pressure treated columns. The roof shall be constructed of trusses using steel gusset plates on both sides of the trusses. The decking shall be 2x8 T&G planking set on 4”x6” purlins and covered by a standing seam roof. 4 led lights to be provided along with one duplex GFCI waterproof receptacle. See contract specifications for details. Part 2 – GENERAL REQUIREMENTS - Primrose & Goldenrod Campsite Electrification The Contractor shall construct the following: a. Coordinate and Install new transformer and primary underground conductors from the existing Gatbrier transformer to the site located on the drawings with Southern Indiana Power (SIP) Pg E-01. b. Install 6 50-amp RV pedestals on the Primrose loop and 5 50-amp RV Pedestals on the Goldenrod Loop. c. Remove the existing HOST site RV Pedestal. d. Install new underground service conductors and feeders to the 11 RV pedestals and to the future shelters located on the plans. e. At the shelter sites install ground boxes one each at the shelter location to coil the wire until the structures are constructed. f. Place an electrical panel near the transformer as shown on the drawings. g. The locations and descriptions of all work items are displayed on the drawings and included in the specifications.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 26 - Electrical, Medium-Voltage Transformers, Low-Voltage Transformers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents