Similar Projects
Last Updated | 03/02/2023 10:02 AM |
Project Title | Deschutes River RM 34.5 Restoration Project |
Physical Address | View project details and contacts |
City, State (County) | Rainier, WA 98576 (Thurston County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Environmental, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $237,890 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Engineer's Estimate as a Range (Construction Only): $200,000 - $400,000 Location: Rainier, WA (Thurston County) Schedule: In-water work window: July 15 --- Sept 15, 2023, project end Oct. 15, 2023 Contact: Cole Baldino, Project Manager - coleb@spsseg.org, 360- 464-0004 Procedure: 1. Access the Eid Announcement and resource materials via the Drive Link. 2. Request access to be added to Roster List and access bid materials. 3. Access/view all resource materials in the Drive Folder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project provides for construction of the Deschutes River RM 34.5 Restoration Project all in accordance with the attached plans and special provisions. The Project involves a construction of the following main elements: 1. Installation of thirty-eight (38) 45' long 18-24" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 2. Installation of twenty-two (22) 35' long 18-24" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 3. Installation of twenty (20) 25' long 12" diameter vertical logs within the Deschutes River floodplain on Weyerhaeuser property. 4. Installation of seventy-one (71) 20' long 6-12" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 5. Installation of 14 threaded rod connection points between the above logs on Weyerhaeuser property. 6. Installation of 300 linear feet of flood fence on Weyerhaeuser property. 7. Installation of 380 linear feet of brush trench on Weyerhaeuser property. 8. 630 cubic years of channel excavation, haul and compact to create aquatic habitat and improve log stability on Weyerhaeuser property. 9. Harvest and Haul of logs to location of installation. 10. Planting by Owner/Sponsor. 11. Site restoration will be completed for all access and haul routes Note that sensitive areas have been noted on project plans and cannot be used for access and haul. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |