Similar Projects
Ontario Place
New Construction, Infrastructure - 33,600 SF
Conception
$5,800,000 CJ est. value
Olympia, WA 98501

South Sound Commerce Center
New Construction, Infrastructure - 449,000 SF
Conception
$241,100,000 CJ est. value
Tumwater, WA 98501

New Police Station - City of Lacey
Demolition, New Construction, Infrastructure
Design
$38,000,000 CJ est. value
Lacey, WA 98503

SR 507/N of Connor Rd - Culvert Replacement
Infrastructure
Design
$123,000 CJ est. value
Rainier, WA 98576

Fairgrounds Infrastructure Improvements Project
Renovation, Infrastructure
Bidding
$430,000 CJ est. value
Lacey, WA 98503

Community Action Council - Monarch Expansion
Addition, Demolition, Infrastructure
Bidding
$245,585 CJ est. value
Lacey, WA 98516

Jack and Bore Storm Water Drainage Interstate 405
Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
Olympia, WA 98501

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Veterans Services Suite
Demolition, Infrastructure
Results
$325,000 CJ est. value
Olympia, WA 98501

Golf Club Road Water and Wastewater Improvements
Infrastructure
Results
$6,562,091 CJ est. value
Lacey, WA 98503

FSCSS Olympia Affordable Apartment Phase 2
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Olympia, WA 98502

Lacey Fire District 3 Vehicle Repair Facility Expansion
Addition, Demolition, Infrastructure
Construction
$2,784,000 CJ est. value
Olympia, WA 98513

Pilot Travel Center / Tumwater
Addition, Infrastructure, Build-out - 1,100 SF
Pending Verification
$400,000 CJ est. value
Tumwater, WA 98512

Pioneer Park Fish Hatchery - Washington Department of Fish and Wildlife
New Construction, Infrastructure - 11,000 SF
Pending Verification
$20,000,000 CJ est. value
Tumwater, WA 98501

Last Updated 03/02/2023 10:02 AM
Project Title

Deschutes River RM 34.5 Restoration Project

Physical Address View project details and contacts
City, State (County) Rainier, WA 98576   (Thurston County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $237,890 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Engineer's Estimate as a Range (Construction Only): $200,000 - $400,000 Location: Rainier, WA (Thurston County) Schedule: In-water work window: July 15 --- Sept 15, 2023, project end Oct. 15, 2023 Contact: Cole Baldino, Project Manager - coleb@spsseg.org, 360- 464-0004 Procedure: 1. Access the Eid Announcement and resource materials via the Drive Link. 2. Request access to be added to Roster List and access bid materials. 3. Access/view all resource materials in the Drive Folder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project provides for construction of the Deschutes River RM 34.5 Restoration Project all in accordance with the attached plans and special provisions. The Project involves a construction of the following main elements: 1. Installation of thirty-eight (38) 45' long 18-24" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 2. Installation of twenty-two (22) 35' long 18-24" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 3. Installation of twenty (20) 25' long 12" diameter vertical logs within the Deschutes River floodplain on Weyerhaeuser property. 4. Installation of seventy-one (71) 20' long 6-12" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 5. Installation of 14 threaded rod connection points between the above logs on Weyerhaeuser property. 6. Installation of 300 linear feet of flood fence on Weyerhaeuser property. 7. Installation of 380 linear feet of brush trench on Weyerhaeuser property. 8. 630 cubic years of channel excavation, haul and compact to create aquatic habitat and improve log stability on Weyerhaeuser property. 9. Harvest and Haul of logs to location of installation. 10. Planting by Owner/Sponsor. 11. Site restoration will be completed for all access and haul routes Note that sensitive areas have been noted on project plans and cannot be used for access and haul.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents