Similar Projects
Center Street Arch - City of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT 84601

Reconstruct North Apron - City of Provo
Infrastructure
Conception
$1,640,550 est. value
Provo, UT 84601

Ben Lomond Golf Course Mixed Use
New Construction - 40,836 SF
Design
Harrisville, UT 84414

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Bidding
$472,000 CJ est. value
Huntington, UT 84528

Syracuse City Corporation Secondary Reservoir Project Phase 2
Renovation, Infrastructure
Bidding
$6,000,000 CJ est. value
Syracuse, UT 84075

Draper Prison Demolition
Demolition, Infrastructure
Sub-Bidding
$14,000,000 CJ est. value
Draper, UT 84020

Spanish Fork Community Network Building Bid Package: BP-02 - All Remaining Trades BP-01-Metal Building
New Construction, Infrastructure
Sub-Bidding
$250,000 CJ est. value
Spanish Fork, UT 84660

RFQ D/B - West 388th/419th Fighter Wing Apron at Hill Air Force Base
Term Contract, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

Harvest View Park Phase 2 - Site Construction
Renovation
Post-Bid
Santaquin, UT

Power Building Site Work
Results
Salem, UT 84653

Upper Spring Creek Tank Rehabilitation Part 2
Results
Springville, UT

North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Construction
Orem, UT

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

Last Updated 08/12/2022 02:31 PM
Project Title

Cemetery Tank Replacement Project

Physical Address View project details and contacts
City, State (County) Fillmore, UT 84631   (Millard County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,938,421 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Separate sealed bids for construction of Fillmore City Cemetery Tank Replacement Project will be received by Fillmore City from bidders. The work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the CONTRACT DOCUMENTS and as shown on the DRAWINGS. The Fillmore City cemetery water tank is a 200,000 gallon above-ground steel water tank located north of the City Cemetery. The current tank is configured to provide storage for the City's lowest pressure zone. The current tank frequently drops to lower levels during high demand scenarios and struggles to remain filled. The project includes replacing the existing steel tank with a one-million-gallon concrete tank, adding 6,100' of 12" Ductile Iron Pipe for the tank fill line and discharge line and constructing a small irrigation booster pump system and building. The intent of the project is to provide more storage capacity for the lower pressure zone for Fillmore City. Click on "Plan Room" at the top of the homepage. Bidders must register and sign-in and choose to become a plan holder to obtain access to CONTRACT DOCUMENTS and DRAWINGS. Notices regarding changes/amendments to the CONTRACT DOCUMENTS and DRAWINGS will be sent to the e-mail address associated with the bidder's registration. Bidders are responsible to maintain current and correct contact information and check the plan room often to receive updates or additional documents/ changes/amendments. The ENGINEER for this Contract will be Sunrise Engineering, Incorporated and they will be represented by Devan Shields, P.E. as Project Engineer.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents