Similar Projects
South Indian Land Sewer Extension
Post-Bid
Lancaster, SC 29720

Howard Street Phase 2, Cleveland Park Area Waterline Rehabilitation Project
Post-Bid
Spartanburg, SC 29301

East Main Street at South Anderson Road Waterline
Results
Rock Hill, SC

Storm Water Monitoring Services
Results
Columbia, SC 29207

Clem's Brand/Sugar Creek Interceptor Phase III
Post-Bid
SC

Replacement of All Existing Waterlines and Meters
Results
Less than $2,859,092 est. value
Bethune, SC 29009

Welpine Gravity Sewer
Post-Bid
$2,000,000 to $3,000,000 est. value
Anderson, SC

Grease Trap Cleaning Services for 22 Sites
Results
Summerville, SC 29483

Water Sewer System Improvements - Connelly Road - 6" Main
Post-Bid
Pickens, SC

Ehrenclou Drive Water and Sewer Line Extensions
Results
Less than $199,038 est. value
Camden, SC 29020

Belton Drive Sewer Improvements
Post-Bid
Williamston, SC 29697

Highway 327 and Highway 57 Water Line Relocation
Results
Florence, SC

Joanna Waterline Improvements
Post-Bid
SC

Milwee Sewer Replacement
Results
Less than $1,350,000 est. value
Greenwood, SC 29646

Highway 72 Distribution Main
Post-Bid
SC

Last Updated 05/18/2020 01:32 AM
Project Title

Installation of Water and Sewer Lines

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install owner-provided water,sewer lines, and grinder pump to three recently-placed mobile units at 823 West 5th North Street, Summerville, SC. The project scope includes the following: 1. Install sewer lines as indicated in attached map. A 2” line will tie-in to the manhole located on the western corner of property and will run to a grinder pump provided by County. 6” line will run from the pump along the back side of the mobile units and will “T” off to each unit. 2. Install owner-provided grinder pump package per manufacturer recommendations as shown in Section D. Pipe and pump will be provided by the County, and specifications are located in Section D. Contractor will need to advise on materials needed for water line. 3. Sewer service to the property is provided by Dorchester County, and water service is provided by CPW. 4. Obtain permitting and business license from the Town of Summerville. 5. Ensure finished work meets county’s approval. 6. Remove all debris left over. 7. Any change orders not in the scope or agreed upon prior to work beginning must be approved before it is started. 8. All work must meet all electrical and building code standards

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents