Project Title | North - South Freeway, Capitol Drive to 2100' N. of Hampton Avenue |
Physical Address | View project details and contacts |
City, State (County) | WI (Milwaukee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Excavation Common, 183,854 CY; Excavation Rock, 0,968 CY; Backfill Granular, 2,374 Ton; Backfill Structure, 7,199 Ton; Base Aggregate Dense, 52,249 Ton; Select Crushed Material, 97,823 Ton; Select Crushed Material, 16,710 CY; Concrete Pavement, 103,776 SY; Concrete Masonry Bridges, 8,211 CY; Concrete Masonry Culverts, 341 CY; Concrete Masonry Retaining Walls, 3,858 CY; oncrete Masonry Overlay, 79 CY; Prestressed Girders, 6,218 LF 36W-Inch, 5,420 LF 72W-Inch; Bar Steel Reinforcement, 389,184 Lbs; Bar Steel Reinforcement Coated, 1,614,995 Lbs; Structural Steel HS, 8,350 Lbs; Piling Steel, 4,035 LF 10-Inch, 3,750 LF 12-Inch; Marking Tape, 21,058 LF; Marking Epoxy, 63,326 LF; Conduit, 36,609 LF; Storm Sewer Pipe, 159 LF 12“, 2,146 LF 15“, 2,754 LF 18“, 8,893 LF 24“, 1,884 LF 30“, 516 LF 36”, 250 LF 48”; Storm Sewer / Culvert Pipe Horizontal Elliptical or Pipe Arch, 204 LF 34” X 38”, 599 LF 29“ X 45”, 243 LF 34“ X 53”, 68 LF 38“ X 60”; Concrete Curb, 461 LF; Concrete Curb and Gutter, 8,490 LF; Concrete Sidewalk, 15,541 SF; Beam Guard, 481 LF; Beam Guard Energy Absorbing Terminals, 4 Each; Asphaltic Surface, 202 Ton; HMA Pavement, 4,350 Ton; Removing Asphaltic Surface Milling, 15,072 SY; Tack Coat, 2,424 Gals; Signs, 3,317 SF; Bar Steel Reinforcement Stainless, 12,710 Lbs; Bearings, 124 Each; Steel Diaphragms, 11,193 Each; Concrete Masonry Ancillary, 148 CY; Noise Barrier Double-Sided Sound Absorptive, 31,913 SF; Concrete Barrier, 19,836 LF; Riprap, 1,455 CY; Pond Liner Clay, 1,839 CY; Pull Boxes, 54 Each; Junction Boxes, 65 Each; Concrete Bases, 59 Each; Poles, 81 Each; Communication Vault, 13 Each; Wall Concrete Panel Mechanically Stabilized Earth, 83,820 SF. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |