Similar Projects
Winghaven Library Roof Replacement
Renovation
Sub-Bidding
$363,099 CJ est. value
O Fallon, MO 63368

Spring Bend Cabin Roof Replacement
Alteration
Post-Bid
Saint Charles, MO 63303

SL District St. Charles Maintenance Building Reroof
Infrastructure
Post-Bid
Saint Charles, MO 63303

Holt HS Roofing
Results
Wentzville, MO 63385

Heritage ES Roofing
Results
Wentzville, MO 63385

SL District O'Fallon Construction Office Roofing
Alteration
Post-Bid
Cottleville, MO 63304

Police Department Firing Range Lower Classroom Roof Replacement
Alteration
Results
Defiance, MO 63341

Guttering Bids
Renovation
Post-Bid
$200,000 CJ est. value
Saint Charles, MO 63301

Roofing
Alteration
Results
Saint Charles, MO

Roofing System Maintenance and Repair
Term Contract
Post-Bid
Saint Charles, MO 63301

Fire Station 1 Roof Replacement
Alteration
Results
Saint Charles, MO 63301

400 North Second Street Building Roof Repair and Structural Stabilization
Alteration
Results
Saint Charles, MO 63301

Roofing Restoration
Renovation
Results
Wentzville, MO 63385

Weldon Spring Roof Replacement Project
Renovation
Results
$19,400 CJ est. value
Weldon Spring, MO 63304

Timberland High School Auditorium Roof Replacement
Renovation
Results
$302,291 CJ est. value
Wentzville, MO 63385

Last Updated 03/24/2023 06:09 PM
Project Title

Public Works Building Roof Replacement

Physical Address View project details and contacts
City, State (County) Lake Saint Louis, MO 63367   (Saint Charles County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $144,848 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the completion of: Installation of TPO roof membrane, skylights & roof curbs and required associated materials & products on the Public Works building; Replacement of damaged shingles, gable end-wall louvers & painting of fascia board on Salt House building on the same property. Additionally, include the removal and disposal of materials removed or unused. Bids must be submitted on the appropriate bid forms provided and must be accompanied by a bid security in the amount equal to and not less than five percent (5%) of the base bid, payable without recourse to the City. The Security may be in the form of a certified cashier's check or a bidder's bond in the same amount from an Incorporated Surety licensed to do business in the State of Missouri as a guarantee that the bidder will enter into a contract and execute, a one hundred percent (100%) performance bond, a one hundred percent (100%) payment bond, and guaranty forms provided within ten (10) days after notice of acceptance of bid to him. Upon request, bid checks will be returned to the unsuccessful bidders when their bids are rejected. No bidder may withdraw his bid within 60 days after the bid opening. The City of Lake Saint Louis, Missouri retains the right to reject any or all bids submitted. The wage rates applicable to this project have been determined as required by law and are set forth in the detailed specifications. All methods, procedures, equipment, and workmanship used for the completion of this project must be in accordance with the attached Contract Documents. All requests for clarifications on these bidding documents must be received no later than Thursday, February 9, 2023, by 12:00 PM. The enclosed Request for Information (RFI) form shall be used for all submittals. Questions may be directed to the Project Manager as follows: Darin Johnson; via phone at 636-265-3692; via email at djohnson@lakesaintlouis.com. Scope of Work: The Contractor shall furnish all of the labor, materials, machinery, and equipment and perform all of the work outlined below in accordance with the attached proposal. This contract shall consist of work described in contractor's proposal respondent to Sealed Bid No. 18-22, and include all items listed in the Request for Sealed Bid and any additional items listed in the proposal attached. The scope is further described as: The work associated with this contract consists of all work necessary to complete Installation of TPO roof membrane, skylights & roof curbs and required associated materials & products on the Public Works building; Replacement of damaged shingles, gable end-wall louvers & painting of fascia board on Salt House building on the same property. Including removal & disposal of all materials removed or discarded.

Details

11,990 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents