Similar Projects
Rehabilitate Taxiway C North
Bidding
Norfolk, VA 23518

Solid Runway Deicer, DCA and IAD
Term Contract
Bidding
Less than $2,000,000 est. value
Arlington, VA

Charlottesville-Albemarle Airport-Apron Expansion
Post-Bid
$999,999 est. value
Charlottesville, VA 22911

Rehabilitate Taxilane and Landside Pavement at Virginia Highlands Airport
Post-Bid
Abingdon, VA

Airport Apron Expansion
Results
$592,999 est. value
Dublin, VA

Design Bid Build, Repair LP Area Runway + ILS Installation
Results
$10,000,000 to $25,000,000 est. value
Norfolk, VA

Concourse B Apron Expansion and Deicing Facility
Infrastructure
Bidding
Richmond, VA 23250

T-Hangar Taxilanes Rehabilitation Phase I
Post-Bid
Chesapeake, VA 23323

Rehabilitate Taxiway C, Taxilane V, and Runway 5-23 Phase II
Results
Norfolk, VA

Runway 5-23 Taxiway and Apron Rehabilitation
Post-Bid
Gordonsville, VA

Rehabilitate Taxiway A - Seal Coat at Winchester Regional Airport
Results
Winchester, VA

Runway 13-31 Rehabilitation
Post-Bid
Danville, VA 24540

2020 Helipad Construction
Results
Chesterfield, VA 23832

MCAF Runway Repairs and Shoulder Extension, Marine Corps Base Quantico, VA
Post-Bid
$10,000,000 est. value
Quantico, VA 22134

Airport Road Relocation and Apron Expansion
Results
Martinsville, VA 24112

Last Updated 05/26/2021 10:37 AM
Project Title

Farmville Regional Airport - Runway Safety Area Grading (20016)

Physical Address View project details and contacts
City, State (County) Farmville, VA 23901 (Cumberland, Prince Edward Counties)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This grading project will bring the airport into compliance with current Runway Safety Area (RSA) grade standards. The project includes: *Grade approximately 24 acres of land (estimated 33,000 CY of earthwork) to meet current Runway Safety Area (RSA) standards *Demolish existing midfield taxiway turnaround pavement (asphalt) *Erosion control and stormwater management *Electrical - adjust Precision Approach Path Indicators (PAPIs)

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents