Similar Projects
Juniper Ridge Public Works Administration, Lab, and Warehouse - FA25AX - City of Bend
New Construction, Infrastructure
Conception
$48,804,000 CJ est. value
Bend, OR 97703

Pool Deck Re-Surface - City of Forest Grove
Infrastructure
Conception
$250,000 CJ est. value
Brothers, OR 97712

New Elementary School
New Construction - 86,000 SF
Design
$29,500,000 est. value
Sisters, OR

Cottages on Helmholtz
New Construction, Infrastructure
Design
$32,800,000 CJ est. value
Redmond, OR 97756

Street and Pedestrian Improvements Project
Infrastructure
Bidding
$300,000 CJ est. value
Brothers, OR 97712

Water Reclamation Facility (WRF) Primary Clarifier Rehabilitation
Infrastructure
Bidding
$2,645,000 CJ est. value
Bend, OR 97701

RFP Construction Manager - Redmond Municipal Airport Terminal Building Expansion Project
Addition, Demolition, Infrastructure
Post-Bid
$200,000,000 CJ est. value
Redmond, OR 97756

ESB Klamath Falls Mile Marker Replacement Rebid
Infrastructure
Post-Bid
$250,000 CJ est. value
Bend, OR 97703

Region 4 Arts
Infrastructure
Results
$3,333,633 CJ est. value
La Pine, OR 97739

J-Lateral Piping Project
Infrastructure
Results
$1,837,294 CJ est. value
Redmond, OR 97756

New Stevens Ranch Library - Deschutes County
New Construction, Infrastructure
Pending Verification
$113,000,000 CJ est. value
Bend, OR 97703

Sunset Meadows
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Sisters, OR 97759

Brosterhous and Chase Intersection - 1TCHI - City of Bend
Infrastructure
Conception
$1,000,000 CJ est. value
Bend, OR 97702

US97: Multi-Use Trail (Baker Rd. - Lava Butte)
Infrastructure
Design
$4,677,000 CJ est. value
Bend, OR 97707

Main Street ADA Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Brothers, OR 97712

Last Updated 06/28/2023 12:17 PM
Project Title

Add Multi-Purpose Instructional Space/Sky View Middle - 2022 Bond - Bend-La Pine Schools

Physical Address View project details and contacts
City, State (County) Bend, OR 97701   (Deschutes County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $13,556,210 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sky View Middle Add Multi-Purpose Instructional Space $13,556,210 As of June 28, 2023, the bond vote passed. Per owner this project has not been put out for a design RFP yet. It will be a few years before that happens.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents