Similar Projects
Holland Road - Mixed Use Assembly
New Construction
Conception
Apex, NC 27502

Capitol Boulevard Mixed Use
New Construction - 1,700,000 SF
Design
Raleigh, NC

301 West Cabarrus
Renovation - 22,855 SF
Design
$4,250,521 est. value
Raleigh, NC

RFP Construction Manager at Risk - Polk Hall Renovations
Renovation
Bidding
$10,000,000 CJ est. value
Raleigh, NC 27607

RFQ Contractor - Residential Construction Services - Acquisition, Demolition and Elevation
Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Raleigh, NC 27601

Triangle Math and Science Academy High School
New Construction, Infrastructure - 120,000 SF
Sub-Bidding
$32,000,000 CJ est. value
Apex, NC 27502

Neuse River Resource Recovery Facility (NRRRF) Bioenergy Recovery Project (BERP) - BP 12 - Sidestream Treatment
New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Raleigh, NC 27610

Airport Boulevard Sidewalk Project
Infrastructure
Post-Bid
$500,000 est. value
Morrisville, NC 27560

Archives and History Building Foundation Repairs and Drainage Improvements
Renovation, Infrastructure
Results
$965,000 CJ est. value
Raleigh, NC 27601

FY 2021 Street Improvements
Results
$6,259,245 est. value
Cary, NC

Tower VI
New Construction
Construction
Raleigh, NC 27609

West Cabarrus Street
New Construction - 238,778 SF
Construction
Raleigh, NC

The Exchange Raleigh - Future Phases
New Construction, Infrastructure - 125,000 SF
Pending Verification
$850,000,000 CJ est. value
Raleigh, NC 27609

The Exchange Raleigh - Future Phases
New Construction, Infrastructure - 125,000 SF
Pending Verification
$850,000,000 CJ est. value
Raleigh, NC 27609

Sportsmanship Crossing Development / Holly Springs
New Construction, Infrastructure - 100,000 SF
Design
$50,000,000 CJ est. value
Holly Springs, NC 27540

Last Updated 02/06/2023 03:08 PM
Project Title

Auburn Church Road Office / Warehouse Building

Physical Address View project details and contacts
City, State (County) Garner, NC 27529   (Wake County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 6, 2023, the project is in planning stage and seeking approvals from the City of Raleigh. Information regarding the architect and general contractor have not been disclosed. The construction timeline has not been determined, but is not expected to begin before the third quarter of 2023.

Details

2 Stories Above Grade, 30,620 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents