Similar Projects
Kennedy Tower Generator Replacement
Post-Bid
Rochester, NY 14611

Electric Actuators
Post-Bid
White Plains, NY 10601

Z--528A7-14-715 Renovate Secondary Electrical Distribution
Results
$2,000,000 to $5,000,000 est. value
Syracuse, NY

Z--528A7-18-708 Replace Obsolete Panelboards
Results
$250,000 to $500,000 est. value
Syracuse, NY

Tandem Axle Trailer with Generator Installation
Post-Bid
Buffalo, NY 14202

Z--528A6-19-621 Emergency Power for B76 Chiller
Results
$100,000 to $250,000 est. value
Bath, NY 14810

High Voltage, Switchgear, Service, Emergency Electrical Work
Term Contract
Post-Bid
Buffalo, NY 14215

J--Testing & PM for Generator Systems - Buffalo/Batavia
Results
$100,000 to $250,000 est. value
Batavia, Buffalo, NY 14215

Structured Cabling, Racks and Associated Electrical Work for Department of IT
Post-Bid
Port Chester, NY 10573

Generator Power Redistribution
Results
Armonk, NY 10504

Lower Campus Housing - Emergency Generator
Renovation
Post-Bid
Canaan, NY 12029

Gowanda CSD Capital Outlay 2019-2020
Results
Gowanda, NY 14070

Power System Study
Post-Bid
Auburn, NY 13021

Electrical Wiring
Results
$7,335 est. value
Rye Brook, NY 10573

Electrical Work - Lighting and Control System Jamestown Riverwalk Illumination
Post-Bid
Jamestown, NY 14701

Last Updated 10/14/2021 10:55 AM
Project Title

Sanitary Wastewater Pump Station Upgrades Electrical Construction

Physical Address View project details and contacts
City, State (County) Saratoga Springs, NY   (Saratoga County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project work sites are located at Excelsior springs, Quad 2 and Hathorn North pump station. Contractor shall provide all labor, materials, machinery, tools, scaffolding, equipment and other means of construction necessary and incidental to the completion of the sanitary wastewater pump station upgrades - Electrical Construction.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 26 - Electrical.
Division 33 - Utilities.
Division 40 - Process Integration.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents