Similar Projects
Lost Trails at the Cove
New Construction
Conception
Hurricane, UT

Walmart Supercenter #3220-239 - SPRB-1
Renovation - 188,937 SF
Design
Saint George, UT 84790

Walmart Supercenter #1439-244 - SPRB-1
Renovation - 224,510 SF
Design
Washington, UT 84780

Sienna Hills development Parcel 17B
Post-Bid
Washington, UT

Green Springs MHD5
Post-Bid
Washington, UT

CityView Mixed Use Development
New Construction - 19,000 SF
Construction
$40,000,000 est. value
Saint George, UT

Walmart 0-5--Moneycenbid--Region #5
Renovation
Construction
$7,596 est. value

Desert Color Development
New Construction
Pending Verification
Saint George, UT

Go Wireless Verizon
Build-Out
Pending Verification
Saint George, UT

Sun River Commons
New Construction
Design
Saint George, UT

Anasazi Kayenta Parcel
Post-Bid
Washington, UT

Walmart Supercenetre #1439-234 - RM-2
Renovation - 224,510 SF
Construction
$1,600,305 est. value
Washington, UT 84780

Commerce Hospitality Center
New Construction
Pending Verification
Washington, UT

Commerce Pointe
New Construction
Design
Saint George, UT

Big Water 150 Acre Parcel
Post-Bid
Washington, UT

Last Updated 08/27/2019 03:07 PM
Project Title

Walmart Supercenter #3220-233 - OGP-GB

Physical Address View project details and contacts
City, State (County) Saint George, UT 84790   (Washington County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method
Project Status Construction Commenced August 2019, Construction Complete as of August 2019
Bids Due View project details and contacts
Estimated Value $26,515
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Online Grocery Pickup Go Backs
Details 1 Retail, 1 Story Above Grade, 850 to 1,000 SF Renovation.
Division 01 - General Requirements, Summary, Alternates, Project Management and Coordination, Construction Progress Documentation, Submittal Procedures, Regulatory Requirements, Quality Assurance, Quality Control, Testing Laboratory Services, Product Requirements, Owner-Furnished Products, Execution, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures.
Division 03 - Concrete, Structural Concrete.
Division 04 - Masonry.
Division 05 - Metals, Cold-Formed Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Door Hardware, Glazing.
Division 09 - Finishes, Gypsum Plastering, Resilient Flooring, Resilient Base and Accessories, Painting and Coating.
Division 26 - Electrical, Common Work Results for Electrical, Wiring Connections.
Division 27 - Communications.
Division 31 - Earthwork, Selective Clearing, Shoring.
Division 32 - Exterior Improvements, Paving Specialties.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents