Similar Projects
Southern Boulevard Industrial Center
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
West Palm Beach, FL 33411

Southern Boulevard Industrial Center
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
West Palm Beach, FL 33411

Tuttle Royale
New Construction, Infrastructure
Design
$279,600,000 CJ est. value
Royal Palm Beach, FL 33411

Tuttle Royale
New Construction, Infrastructure
Design
$279,600,000 CJ est. value
Royal Palm Beach, FL 33411

D/B - US 98 Bypass
Infrastructure
Bidding
$30,919,182 est. value
Loxahatchee, FL

CVS #7891 Parking Lot ADA Improvements / Lake Worth - Rebid
Infrastructure
Post-Bid
$100,000 CJ est. value
Lake Worth, FL 33467

Wallis Road Improvements Phase 2
Post-Bid
$1,100,000 est. value
FL

Safety D/B Push Button for WWD Devices at Interstate Ramps
Results

Annual Milling and Resurfacing Contract
Term Contract
Results
$52,250,000 est. value
FL

Home Depot Site Work at Alton
New Construction
Construction
Palm Beach Gardens, FL 33418

FPL Okeechobee Transmission Corridor
New Construction
Construction
$1,685,000 est. value
West Palm Beach, FL 33409

PopStroke Golf Facility - Tiger Woods
New Construction, Infrastructure - 4,500 SF
Pending Verification
$1,760,000 CJ est. value
Delray Beach, FL 33483

PopStroke Golf Facility - Tiger Woods
New Construction, Infrastructure - 4,500 SF
Pending Verification
$1,760,000 CJ est. value
Delray Beach, FL 33483

Florida's Turnpike SR 91 Widening - Florida Department of Transportation
Infrastructure
Conception
$1,000,000 est. value
Jupiter, FL

AutoZone #5999 / Wellington
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Village of Wellington, FL 33414

Reported 09/03/2022 12:00 AM
Project Title

Covered Walkway and Platform for Temporary Boiler

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33410   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT SUMMARY: The Contractor shall provide all tools, equipment and materials required to build a covered walkway to connect the temporary boiler plant to the Energy Center. Project is located within the West Palm Beach VAMC, 7305 N. Military Trail, West Palm Beach, FL 33410. MAGNITUDE OF CONSTRUCTION: Between $25,000 and $100,000. The West Palm Beach VA Medical Center is a smoke-free facility. Contractors: To enter the Medical Center, you must present a valid picture ID. All contractors are required to wear a face mask in accordance with Guidelines. Prior to entering the medical center, all contractors will be screened in accordance with Guidelines. The VA will not provide any Personal Protective Equipment (PPE). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Magnitude: Between $25,000.00 and $50,000.00.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents