Similar Projects
Public Space Restoration Contract for FY18-FY21
Results
$15,000,000 to $20,000,000 est. value
Washington, DC

Streetscape Improvement General
Post-Bid
Washington, DC

Local Sidewalk Restoration, Porous Flexible Paving
Post-Bid
Washington, DC 20001

Non-Citywide Local Pavement Restoration
Post-Bid
DC

Traffic Coating Restoration
Results
Washington, DC 20230

FY 2018 Federal Aid Citywide Pavement Restoration
Post-Bid
Washington, DC 20001

Construction Management Services for Local Pavement Restoration
Post-Bid
Washington, DC 20001

Concrete Work at Multiple Installations
Post-Bid
$20,000,000 to $40,000,000 est. value
Washington, DC - Arlington, Bowling Green, Fort Belvoir, VA

New York Avenue NE - Left Turn Lane at Walt Lincoln Way
Post-Bid
Washington, DC

George Washington Memorial Parkway
Results
$1,000,000 to $5,000,000 est. value
Washington, DC 20001

Martin Luther King Jr. Ave Southeast Revitalization
Post-Bid
Washington, DC 20001

Massachusetts Avenue, NW Rehabilitation from 20th Street to Waterside Drive
Post-Bid
Washington, DC 20009

Reconstruction of Florida Avenue, and 9th Street, NW from T Street to Barry Place, NW
Post-Bid
Washington, DC 20009

City-Wide Local Traffic Safety Improvement (Construction)
Bidding
Washington, DC 20009

Reported 04/04/2019 12:00 AM
Project Title

Reconstruction of Oregon Avenue, NW from Military Road to Western Avenue from Oregon Avenue to 31st Street

Physical Address View project details and contacts
City, State (County) DC   (District of Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Work under this contract consists of roadway improvement, installation of new sidewalk on west side, new curb and gutter, streetlights, utility upgrades, signage and pavement markings, drainage structures and system, LID facilities and a new bridge over Pinehurst Run.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents