Similar Projects
Currie Parkway Bridge: Rehabilitation - City of Midland
Renovation, Alteration
Conception
Less than $460,000 est. value
Midland, MI 48640

Westside Subdivision
New Construction, Infrastructure
Conception
$23,000,000 CJ est. value
Hope, MI 48628

Patel Assisted Living & Memory Care
Demolition, New Construction, Infrastructure - 159,190 SF
Design
$42,500,000 CJ est. value
Midland, MI 48642

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Parking Lots & Drives Crack Filling, Sealcoating and Line Striping 2023
Infrastructure
Bidding
$175,000 CJ est. value
Midland, MI 48640

Bid Packet 22-203 Transportation Bus Lot Improvements
Infrastructure, Alteration
Post-Bid
Midland, MI 48640

Gensel Drive and Wackerly Road Water System Extensions
Infrastructure
Post-Bid
$400,000 est. value
Sanford, MI

2022 Soccer Drive Water Main; Contract No. 01
Alteration
Results
Midland, MI

2022 Pine St & North St. Reconstruction & Water Main
Alteration
Results
Midland, MI

Rodd Street Office Building
New Construction, Infrastructure - 15,200 SF
Construction
$3,000,000 CJ est. value
Midland, MI 48640

Commerce Drive Multi Residential / Midland
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Midland, MI 48642

Center City Lofts / Midland - Rebid
New Construction, Infrastructure - 57,549 SF
Post-Bid
$16,000,000 CJ est. value
Midland, MI 48640

2022 Brambleridge, Woodbridge, Sutton Reconstruction & Water Main
Alteration
Results
Midland, MI

Popeye's - Midland
New Construction, Infrastructure - 3,050 SF
Post-Bid
$3,000,000 CJ est. value
Midland, MI 48642

2022 Dilloway Dr & Cortland St Reconstruction & Water Main
Alteration
Results
$600,000 est. value
Midland, MI

Last Updated 03/16/2023 12:35 PM
Project Title

2023 Michigan St. and Helen St. Water Main

Physical Address View project details and contacts
City, State (County) Midland, MI 48640   (Midland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $302,904 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions are submitted online No CONTRACT NO. 04 is for water main installation on Michigan St. from Washington St. to Walnut St. and on Helen St. from Manor Dr. to Noeske St. Some of the quantities listed in the Itemized Bid are as follows: 800 Lft 8" PVC C909 Water Main 350 Lft 12" PVC C909 Water Main General Requirements Bid Deposit: 5% Construction shall not begin prior to July 5, 2023, unless otherwise approved by the Engineer. Construction shall be completed no later than September 15, 2023. Once construction begins, the Contractor shall complete the project within 50 consecutive calendar days. Liquidated Damages will be applied to all days beyond the 50 day construction duration and/or beyond the Sept. 15 completion date.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents