Similar Projects
Rocky Mountain Metropolitan Airport Taxiway Reconstruction - Jefferson County
Infrastructure
Conception
$3,053,510 est. value
Broomfield, CO 80021

Elementary/K-8 School in West Lakewood - 2018 Bond - Jefferson County Public Schools
New Construction
Conception
$29,400,000 CJ est. value
Lakewood, CO 80226

Indian Tree Golf Club Improvements
New Construction, Renovation, Addition
Design
Westminster, CO 80005

Murphy Express #8904 / Arvada
New Construction, Infrastructure - 2,800 SF
Design
$1,500,000 CJ est. value
Arvada, CO 80002

RFP Construction Manager - Meyers Pool Replacement Construction Management/General Contractor Services (CMGC)
Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Arvada, CO 80005

Belmar Park Observation Deck and Covered Bridge Renovation Construction Documents
Infrastructure
Bidding
$395,000 CJ est. value
Lakewood, CO 80226

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Elk Meadow Park Stagecoach Trailhead Improvements
Infrastructure
Post-Bid
Evergreen, CO 80439

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Concrete Rehab-Ada Improvements
Results
$200,000 to $250,000 est. value
Wheat Ridge, CO

Murphy Express #8855 / Littleton - Rebid
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Littleton, CO 80127

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Pending Verification
$20,000,000 CJ est. value
Broomfield, CO 80021

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Pending Verification
$20,000,000 CJ est. value
Broomfield, CO 80021

Elementary/K-8 School in Leyden Rock - 2018 Bond - Jefferson County Public Schools
New Construction
Conception
$29,400,000 CJ est. value
Lakewood, CO 80226

Pavement Overlay and Construction of Sedimentation Ponds for County Road 170
Infrastructure
Design
$200,000 CJ est. value
Evergreen, CO 80439

Last Updated 09/27/2022 04:09 PM
Project Title

Green Gables Elementary School Site Plan

Physical Address View project details and contacts
City, State (County) Lakewood, CO 80227   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a new asphalt-walking path around Green Gables ES site. Path will consist of a walkable only section and a section that will be driven on by district owned vehicles. An existing section of degraded asphalt path that is not being replaced will need to be removed and seeded. Seeding will need to wait until spring after irrigation system is turned on. Buyer's Requirements General Requirements - Insurance Required - Local Service Required Question Acceptance Deadline 09/29/2022 06:00 PM EDT Questions are submitted online No

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents