Similar Projects
East Miller Road Expansion - City of Republic
Infrastructure
Conception
Less than $1,000,000 est. value
Republic, MO 65738

MM Five Lane Part 3 - City of Republic
Infrastructure
Conception
$4,000,000 est. value
Republic, MO

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

Bridge Replacement and Ada Improvements
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Republic, MO 65738

Bridge Replacement and Ada Improvements
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Republic, MO 65738

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

Building Demolition and Site Cleanup (List 10-26)
Demolition, Infrastructure
Post-Bid
Springfield, MO

Kansas Expressway Extension Phase I
Infrastructure
Results
Springfield, MO

Resurfacing and ADA Improvements on Farm Road 135 and Farm Road 102
Infrastructure
Results
$637,365 est. value
Springfield, MO 65814

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Construction
$28,000,000 CJ est. value
Springfield, MO 65803

Simply Smart Self-Storage Facility
New Construction, Infrastructure - 55,500 SF
Pending Verification
$6,000,000 CJ est. value
Republic, MO 65619

OZMOD 425
Demolition, New Construction, Infrastructure - 37,533 SF
Pending Verification
$10,500,000 CJ est. value
Springfield, MO 65803

MM Five Lane Part 2 - City of Republic
Infrastructure
Conception
$3,200,000 est. value
Republic, MO

Last Updated 08/15/2023 03:32 AM
Project Title

Resurface - Route 65

Physical Address View project details and contacts
City, State (County) Springfield, MO 65803   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J7P3393 Route 65 DALLAS, GREENE County. Resurface from Route KK in Greene County to Route AA in Dallas County, the total length of improvement being 6.195 miles. (2): Job J8P3164 Route 65 GREENE County. Resurface from I-44 to Route KK, the total length of improvement being 6.456 miles. Range: $2.5M to $5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. All Questions Concerning the Project Should Be Directed to the Project Contact Listed in the Job Special Provisions of the Request for Bid. All Questions Concerning Bid Document Preparation Can Be Directed to the Central Office - Design Division at (573) 751-2876. DBE Goal Percent: 4.00 Contract Time: 11/1/24 MO DOT- G02- Resurface - Route 65 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents