Similar Projects
A-115 - Aquia Bridge Force Main - County of Stafford
Infrastructure
Conception
$2,910,000 CJ est. value
Stafford, VA 22554

24" Main from Cambridge Street to Cool Springs Road - 342-02 - Stafford County
Infrastructure
Conception
$5,724,000 CJ est. value
Stafford, VA 22554

Burns Corner Mixed-Use Development
New Construction, Infrastructure - 7,030 SF
Design
$20,000,000 CJ est. value
Stafford, VA 22554

Burns Corner Mixed-Use Development
New Construction, Infrastructure - 7,030 SF
Design
$20,000,000 CJ est. value
Stafford, VA 22554

St. Clair Brooks Park Stream Restoration
Infrastructure
Bidding
$1,639,000 CJ est. value
Falmouth, VA 22405

Lake Arrowhead Dam Renovation
Infrastructure
Bidding
$320,000 CJ est. value
Stafford, VA 22556

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Subgrade Stabilization
Infrastructure
Results

Leeland Road Widening - Stafford County
Infrastructure
Pending Verification
$7,975,712 CJ est. value
Falmouth, VA 22405

Leeland Road Widening - Stafford County
Infrastructure
Pending Verification
$7,975,712 CJ est. value
Falmouth, VA 22405

Utilities: 342-05.5 24 Water Transmission Main Kelley Road To Beagle Road - BHC072 - Stafford County
Infrastructure
Conception
$1,381,000 CJ est. value
Stafford, VA 22554

Red Apple Pediatric
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Stafford, VA 22556

Wendy's #12182 / Stafford
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Stafford, VA 22554

Last Updated 09/27/2022 06:35 AM
Project Title

Bridge Repairs Over Rappahannock River

Physical Address View project details and contacts
City, State (County) Stafford, VA 22554   (Stafford County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

UPC 118977 Route Number 95 Federal Project Number NHPP-BR026(293) County City Stafford Construction Begin Site I-95N Mm 132.45 Construction End Site I-95N Mm 132.65 VDOT - H73 - Bridge Repairs Over Rappahannock River

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents