Similar Projects
Last Updated | 09/06/2022 11:05 AM |
Project Title | HVAC System Renovation and Corner Window Replacements Cunningham Nursing Building - GPC |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53211 (Milwaukee County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,610,600 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | State of Wisconsin, Department of Administration, Division of Facilities Development, hereinafter termed DFD. NOTICE: Effective January 1, 2014, all potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website. This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general the work consists of correcting temperature control issues throughout the building and eliminating water infiltration on the upper floor corner window units. Floors 3 through 7 will replace the single pane corner window system to stop water infiltration and excessive heat transfer. Floors 4 through 7 will install perimeter radiation heat located along the perimeter to offset drafts and heat transfer through window and envelope system. Additionally, the temperature control zones in the building will be increased from the sub-basement through Floor 7 by adding new VAV boxes with hot46 water control valves. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |