Similar Projects
SR 400 Express Lanes
Bidding
Less than $13,000,000 est. value

Alternative Intersection On-Call Contract
Bidding
$25,000 to $6,000,000 est. value
Atlanta, GA

LMIG 2019 Resurfacing of Sun Valley Subdivision
Post-Bid
East Point, GA

Street Resurfacing Project - 121819
Post-Bid
College Park, GA 30337

Southern Region Disaster Recovery Support BPA
Results

2019 LMIG Street Resurfacing Project
Results
Atlanta, GA 30303

Stacks Road over CSX Railroad - Abutment Wall Repairs and Roadway Drainage Improvements
Bidding
South Fulton, GA

Sumner Dog Park Paving
Post-Bid
East Point, GA 30344

Sandy Springs Circle Streetscape from Hammond Drive to Mount Vernon Highway Project
Results
Sandy Springs, GA 30328

Spout Springs ES Access Drive Modifications
Bidding
Flowery Branch, GA 30542

Church Street Trench Backfill and Resurfacing Improvements
Post-Bid
Palmetto, GA 30268

Hot In Place Recycling Maintenance Activities
Results
Atlanta, GA 30303

2019 LMIG Street Resurfacing - Group 2 South
Bidding
Atlanta, GA

Prequalified Contractors List
Post-Bid
East Point, GA

SR 9/Atlanta Street at Oxbo Road Intersection Realignment
Results
Less than $5,961,859 est. value
Roswell, GA

Last Updated 03/12/2020 08:07 AM
Project Title

Peachtree Corridor Phase III

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30303   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to complete a street retrofit connectivity project. The project consists of constructing a typical section with three lanes in each direction consisting of 10-ft inside and outside lanes, 11-ft center lanes divided by a 19-ft raised landscape median (including turn lanes), 5-ft bike lanes, a header curb, 14-17-ft shoulder comprised of a 6-ft landscape strip and 8 to 11ft wide sidewalks. The connectivity project is to be implemented along Peachtree Rd. from Shadowlawn Avenue to Maple Drive. The project will improve connectivity to existing bus stops and the Buckhead MARTA station.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents