Similar Projects
Traffic Management System Installation
Infrastructure
Conception
$800,000 CJ est. value
Tower, MN 55790

Clure Public Marine Terminal - Duluth Seaway Port Authority
Infrastructure
Design
$10,500,000 CJ est. value
Duluth, MN 55802

2022 King Road Lift Station
Renovation, Infrastructure
Bidding
$520,000 CJ est. value
Orr, MN 55771

Breitung McKinley Park Trail
Infrastructure
Bidding
$412,420 CJ est. value
Tower, MN 55790

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

Scientific Drilling Operations
Infrastructure
Post-Bid
Soudan, MN 55782

Household Hazardous Waste Site Grading and Pavement Improvements
Infrastructure
Results
Duluth, MN

88th Army Reserve Center (ARC)
Infrastructure
Results
$1,107,843 CJ est. value
Duluth, MN 55802

Hangar 101 Demolition and Development - Phase 1
Demolition, Renovation, Infrastructure
Construction
$388,236 CJ est. value
Duluth, MN 55811

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

333 Tower Mixed-Use
New Construction, Infrastructure - 20,000 SF
Pending Verification
$75,000,000 CJ est. value
Duluth, MN 55802

RFP D/B - Engineering Services for 1st Avenue East (Superior Street to 3rd Street)
Infrastructure
Bidding
$300,000 CJ est. value
Duluth, MN 55802

Scientific Drilling Operations for 2022
Infrastructure
Post-Bid
Soudan, MN 55782

Maintenance Building Storage Bay
Addition, Infrastructure
Results
Saginaw, MN 55779

NorthMet Project
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Hoyt Lakes, MN 55750

Last Updated 09/08/2022 03:32 PM
Project Title

Range Regional Airport Industrial Facility Expansion

Physical Address View project details and contacts
City, State (County) Hibbing, MN 55746   (Saint Louis County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Architect - 08/24/22
Owner View project details and contacts
Architect View project details and contacts
Description

AET Project No. P-0009064 Scope Descriptions for more detailed information on the specifics of the content for each of the Work Scopes. Bidders are cautioned to examine the Work Scope Descriptions and contract documents closely to ensure the entire applicable portion of the scope is included in bids for the individual Bid Packages. The project scope consists of the following construction elements: *60,000 sf Building Addition *Interior Buildout *Erosion Control *Foundation work *Electrical *Plumbing *Structural *Mechanical *Utilities *Site work (parking lot & access road) The Notice to Proceed for ordering materials is anticipated to be issued in November 2022 with the Notice to Proceed for construction anticipated to be issued in spring 2023. The work is in accordance with drawings and specifications prepared by RS&H, Inc. The Construction Manager is Max Gray Construction Inc. The project scope consists of multiple bid packages. Bid Proposals shall be submitted on forms furnished for that purpose. Multiple subcontractor and suppliers bids will be received for labor and materials as outlined in the Work Scope Descriptions as described in Section 01011. The schedule of minimum wages as established by the Secretary of Labor and set forth in the specifications is to govern on this project, and bids shall be based on these established minimum wage rates. In accordance with Minnesota law, overtime must be paid for work in excess of 8 hours per day or 40 hours per week. A Project Labor Agreement (PLA) is included and required as part of the contract documents. The bidder/offerer certifies, by submission of this proposal or acceptance of this contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by a Federal department or agency. It further agrees by submitting this proposal that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts and subcontracts. Where the bidder/offerer/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/proposal. Notice of Requirements for Affirmative Action to Ensure Equal Employment Opportunity - State of Minnesota Requirements: The offerers or bidders attention is called to the equal opportunity clause set forth herein. The goals and timetables for minority and female participation, expressed in percentage terms for the contractors aggregate workforce in each trade on all construction work in the Covered Area as follows: Goals for minority participation in each trade, 3.0%; goals for female participation in each trade, 6.9%. These goals are applicable to all contractors construction work performed in the Covered Area. The contractors compliance with Minnesota Statutes, section 473.144 and part 5000.3520 shall be based on its implementation of the equal opportunity clause, specific affirmative action obligations required by part 5000.3540, and its efforts to meet the goals established for the geographical area where the contract resulting from this solicitation is to be performed. Exclusive agreements between DBEs and bidders are forbidden. Chisholm-Hibbing Airport Authority reserves the right to waive failure of a bidder to meet the DBEs goals if sufficient effort as determined by ChisholmHibbing Airport Authority has been made to comply with the DBE goals and the requirements are not met. The bids shall be accompanied by an Affidavit on Non-Collusion and written assurance that the bidder has made a good faith effort towards meeting DBE goals. A bidders or proposers failure to show a good faith effort to achieve the specified contract goal for the participation of Disadvantaged Business Enterprise in the completion of this project will be grounds for finding the bid or proposal non-responsive. Each bid proposal shall be accompanied by a Bid Security in the form of a certified check made payable to the Chisholm-Hibbing Airport Authority in the amount of not less than 5% of the total bid or a surety bond in the amount payable to the Airport Authority with the surety company thereon duly authorized to do business in the State of Minnesota, such Bid Security to be a guarantee that the bidder will not, without the consent of the Airport, withdraw his bid for a period of 60 days after the opening of bids, and if the successful bidder, will enter into a contract with Chisholm-Hibbing Airport Authority and in connection therewith, give Public Contractors Bond as required by law; and the amount of the certified check will be retained or bond enforced by the County in case the bidder fails so to do. The Bid Security of the three lowest bidders will be retained until the contract is executed, but in no event longer than 60 days provided that the Bid Security of the lowest responsible bidder shall be retained in any event until the contract is executed and Public Contractors Bond furnished as herein provided. The bid of the lowest responsible bidder, provided said low bidder has made a good faith effort to meet the DBE contract goal will be accepted on or before the expiration of 60 days after the date of the opening of bids. In the event that the Authority deems it in its best interest to delay the award of the contract (i.e. if the federal funding for the project is delayed) the 60 day time period may be extended for up to one year if mutually agreed upon by both the bidder and the Authority. The Authority, reserves the right to reject any or all bids and to waive any minor irregularities, informalities or discrepancies The CHAA, reserves the right to reject any or all bids and to waive any minor irregularities, informalities or discrepancies. Inquiries regarding Plans and Specifications shall be directed to the Darren Christopher at (218) 722-1227 or Darren.Christopher@ rsandh.com. All questions to be considered shall be submitted in writing to the Construction Manager no later than 5:00 pm on September 22, 2022.

Details

60,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents