Similar Projects
Derby Creek Sewer Rehabilitation - South Interceptor Pump Station Screen Refurbishment
Infrastructure, Renovation
Bidding
$250,000 CJ est. value
Cullman, AL 35058

New Home Economics and VO-AG Facility
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Hanceville, AL 35077

Additions and Renovations to Cullman Middle School
Renovation, Addition
Post-Bid
Cullman, AL 35055

Restroom Facility for Holly Pond High School
New Construction
Post-Bid
Holly Pond, AL 35083

Cullman Water Park - Parking Lot Site Development
Infrastructure
Results
Cullman, AL 35055

New Gymnasium at Cold Springs High School
New Construction
Results
Bremen, AL 35033

Additions for Good Hope Middle School
Addition
Construction
$3,839,000 est. value
Cullman, AL 35057

Family/Consumer Science & Ag Shop Remodel At Fairview High - Cullman County Board of Education
Build-out
Pending Verification
$2,000,000 CJ est. value
Cullman, AL 35058

New Family/Consumer Science & Ag Facility At Hanceville High - Cullman County Board of Education
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Hanceville, AL 35077

Tidal Wave Car Wash / Cullman
New Construction, Infrastructure - 3,120 SF
Bidding
$400,000 CJ est. value
Cullman, AL 35055

Drainage Improvements (Pipe Rehabilitation and Drainage Structure Correction) on I-65
Infrastructure
Post-Bid
$971,143 CJ est. value
Hanceville, AL 35077

Lunchroom Expansion At West Point Elementary/High - Cullman County Board of Education
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Cullman, AL 35055

Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31)
Infrastructure
Bidding
$2,149,785 CJ est. value
Cullman, AL 35055

CVS #4960 / Hanceville
Infrastructure - 44,750 SF
Post-Bid
$500,000 CJ est. value
Hanceville, AL 35077

A New Media Center Addition For Vinemont High School For The Cullman County Board Of Education
Addition, Demolition, Infrastructure
Post-Bid
$100,000 CJ est. value
Cullman, AL 35058

Last Updated 01/06/2023 10:09 AM
Project Title

A New Welding Shop At Holly Pond High School

Physical Address View project details and contacts
City, State (County) Holly Pond, AL 35083   (Cullman County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $940,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall be bid excluding taxes. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. No bid may be withdrawn after scheduled closing for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owners judgment, the best interests of the Owner will thereby be promoted. A certified check or Bid Bond payable to the Cullman County Schools in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00 must accompany the bidder's proposal. Performance and statutory labor and material payment bonds will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect. All bidders shall show such evidence by clearly displaying current license number on the outside of the sealed envelope in which the proposal is delivered. All RFIs and RFAs regarding the bid documents shall be sent and addressed through emails found on the RFI and RFA forms in the project manual. NOTE: ONLY THE RFI AND RFA FORMS IN THE PROJECT MANUAL WILL BE ACCEPTED. The Architect will not accept inquiries via telephone or fax. Completion Time: See scope of work in Project Manual. Supervision: Contractor to ensure proper supervision for all work. Owner: Dr. Shane Barnette, Superintendent, Cullman County Schools, 402 Arnold Street NE, Cullman, Alabama, 35055, Phone (256) 734-2933 Architect: McKee and Associates Architects, Inc., 631 South Hull Street, Montgomery, Alabama 36104, Phone: (334) 834-9933

Details

1 Story Above Grade, 3,000 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents