Similar Projects
South Austin Regional WWTP Trains A & B Improvements
Renovation
Conception
$78,230,000 est. value
Austin, TX 78799

Wilbarger Creek Wastewater Treatment Facility
New Construction
Design
Pflugerville, TX

TBWWTP Expansion, Phase II
Addition
Design
$28,820,000 est. value
Temple, TX 76502

Campbell WWTP Rehab
Renovation
Bidding
$350,000 est. value
Campbell, TX

Sunfield WWTP Expansion
Addition
Bidding
$22,000,000 est. value
Buda, TX 78155

WWTP Improvements TWDB
Post-Bid
Huntington, TX

Centrifuge Control Panel Replacement at Robinson Creek WWTP
Post-Bid
Huntsville, TX

Wastewater Treatment Plant Phase 1
Results
Less than $2,139,671 est. value
TX

Salitrillo Wastewater Treatment Plant Progressive Design Build Upgrades
Results
Less than $25,000,000 est. value
San Antonio, TX 78204

New 0.2875 MGD ADF Wastewater Treatment Plant
New Construction
Construction
$2,553,943 est. value
Houston, TX

Northwest Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

Dallas Salmon Wastewater Treatment Facility
Renovation
Pending Verification
League City, TX

Wastewater Treatment Plant 3 Phase 1 0.25 MGD
New Construction
Bidding
Farmersville, TX

Wastewater Treatment Plant Improvements
Post-Bid
Falfurrias, TX

North Corridor Consolidation Package 1
Results
Less than $23,837,012 est. value
Houston, TX 77000

Last Updated 04/06/2022 07:49 AM
Project Title

Port Arthur Main WWTP Improvements Project

Physical Address View project details and contacts
City, State (County) Port Arthur, TX 77642   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $53,000,000 to $55,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of major rehabilitation of the City of Port Arthur’s Main Wastewater Treatment Plant (WWTP) permitted for an average daily flow of 9.2 MGD and Main Outfall Lift Station sized for a firm pumping capacity of 45 MGD. Scope of work includes the following: 1. Main Outfall Lift Station: Rehabilitation of the Main Outfall Lift Station including replacement of pumps, piping, and appurtenances; New MCC and Variable Frequency Drives (VFDs); HVAC and architectural improvements to the building; and new bypass manifold. 2. Headworks: New headworks with mechanical screens, screenings processing equipment, grit removal and grit washing and dewatering equipment. 3. Primary Clarifiers: Two (2) new 126’ diameter primary clarifiers and primary sludge pumping system. 4. Vaults: New vaults for flow control valves and flow meters. 5. Trickling Filters: New splitter box for trickling filters; improvements to the four (4) existing trickling filters including replacement of mechanism in all 4 trickling filters and replacement of media in 2. 6. Multipurpose Lift Station: New 45 MGD multipurpose lift station including pumps, piping, valves and other appurtenances. 7. Aeration Basins: Demolition of three (3) existing screw pumps at the aeration basins and structural improvements to the aeration basin influent channel. 8. Aeration Basin Blower Building: Replacement of three (3) existing aeration basin blowers with new multi-stage centrifugal blowers; HVAC and architectural improvements to the blower building. 9. Final Clarifiers: Replacement of mechanism in all three (3) final clarifiers; Two (2) new sludge pumping stations; new scum pump in each clarifier; three (3) new vertical turbine pumps and associated piping and valves at the 15 MGD final clarifier effluent lift station. 10. RAS/WAS Meter: New return activated sludge (RAS) and waste activated sludge (WAS) meter stations and associated piping and valves. 11. Filters: New 30 MGD filtration system and associated backwash and solids removal system. 12. Junction Box: Improvements to the existing flow junction box where final clarifier effluent and filtered effluent combine prior the chlorine contact basins. 13. Chlorine Contact Basins: New actuated weir gates, new grating, structural improvements to the chlorine contact basins; and two (2) new multi-stage centrifugal blowers. 14. Non-Potable Water (NPW) System: New non-potable water system consisting of three (3) vertical turbine pumps, two (2) self-backwashing strainers, new 5,000 gallon hydropneumatic tank, new air compressor, and new NPW distribution system. 15. Chemical Feed Building: Replacement of six (6) chlorine ton cylinder scales; two (2) new sodium bisulfite storage tanks; new skid-mounted sodium bisulfite feed pump system; HVAC and architectural improvements of the chlorine feed building. 16. Aerobic Digesters: New coarse bubble diffusers in both digesters; three (3) new positive displacement blowers and associated air piping; new thickened sludge feed pumps; HVAC and architectural improvements to the digester feed pump building. 17. Solids Dewatering System: Two (2) new screw press; three (3) new sludge pumps; new polymer feed system; and associated piping, valves and appurtenances; HVAC and architectural improvements to the building. Alternate bid includes replacement of the two (2) conveyors for the dewatered solids. 18. Administration Building: Remodeling of the administration floor plan to extend the lab room; and HVAC improvements. 19. Electrical Building: Two (2) new North and South Electrical Building to house new electrical system. 20. Generator: Addition of one (1) new 750 kW generator. 21. Overall: Yard piping and site civil improvements. 22. Demolition: Demolition and disposal of existing structures and equipment as indicated on the contract drawings.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents