Similar Projects
Last Updated | 12/13/2019 03:55 PM |
Project Title | Well Construction and Plugging of Existing Wells at the Fuller and Far North Well Sites |
Physical Address | View project details and contacts |
City, State (County) | TX (Tarrant County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Mobilization/Demobilization of equipment and personnel including one (1) OR two (2) rigs, as specified and directed by the City 2. Providing and maintaining temporary sound barrier walls at two (2) sites and construction of well site pads that may be needed to accommodate the Contractor’s equipment. 3. Removing existing pump, motor, cable, and pump columns, decommission and plugging of two (2) water wells. 4. Constructing two (2) public supply water wells in the Twin Mountains Formation (Lower Trinity aquifer). 5. Constructing surface slab and pump foundation at two (2) sites. 6. Installing and testing pumping equipment and wellhead infrastructure at two (2) sites. CATEGORY - MBE - WBE CONSTRUCTION - 19.44% - 9.17% SUPPLIES - 25.34% - 8.82% EQUIPMENT - 16.28% - 11.45% SERVICES - 20.41% - 13.66% |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |