Similar Projects
Preventative Service Maintenance and Inspection of Commercial Chillers, Boilers and Pumps
Term Contract, Alteration
Post-Bid
Wichita, KS

Holliday Building Boiler Replacement
Alteration
Post-Bid
Topeka, KS 66607

Holly Power Plant Replace Backup Boiler
Results
$175,700 est. value
Winfield, KS 67156

Hot Water Boiler 2 Tube Replacement and Boil-Out Procedure
Alteration
Results
Wichita, KS

Water Heater Replacement
Term Contract
Post-Bid
Kansas City, MO 64128

New Century Adult Detention Center Boiler Improvement Project
Alteration
Results
Olathe, KS 66061

Boiler Preventative Maintenance, Hourly Repairs and Emergency Services
Alteration
Post-Bid
Lawrence, KS

Adult Residential Center Programs Building Boiler Replacement
Alteration
Results
Olathe, KS

Leavenworth Fire Station 1 Boiler Replacement
Alteration
Post-Bid
Leavenworth, KS 66048

Criminalistics Lab Mechanical Piping Upgrades
Alteration
Results
Olathe, KS 66061

Kaw Water Treatment Plant Electrical and Mechanical Improvements
Alteration
Post-Bid
Lawrence, KS 66044

Salina Building 320 Nickell Barracks Water Heater Replacement -AGD
Alteration
Results
Less than $231,000 est. value
Salina, KS 67401

Hot Water Boiler 1 Tube Replacement and Boil-Out Procedure
Alteration
Results
KS

Last Updated 12/23/2021 11:04 AM
Project Title

Waste Water Treatment Plant 2 Boiler Burner Upgrade

Physical Address View project details and contacts
City, State (County) Wichita, KS 67216   (Sedgwick County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This scope of work consists of the replacement of the burner for the (1) Cleaver Brooks boiler with a new, high efficiency burner and controls. Additionally, this scope includes tuning of (1) Superior boiler burner to achieve stipulated combustion efficiency. Both boilers are located in the digester building at Wastewater Treatment Plant #2. New burner output capacities will be like-for-like, or as close as possible. This scope includes all demolition, equipment, shipping, material, and labor to replace and tune the identified units.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents