Similar Projects
Groundwater Recharge Ponds Pilot Project
Results
Thornton, CO

North Tank and Beebe Well Field Erosion Protection Project
Results
Brighton, CO

124th Reservoir Riprap Erosion Protection Construction Project
Results
Brighton, CO

Copperleaf Water Quality Pond J Improvements
Post-Bid
$450,000 to $625,000 est. value
Aurora, CO

Quincy Intertie Improvements
Results
$7,400,000 to $8,400,000 est. value
Aurora, CO

Broadway and 62nd Avenue Minor Drainage Improvements
Infrastructure
Results
Brighton, CO

152nd Avenue and Imboden Road Drainage Improvements
Results
CO

2021 Maintenance Culvert Pipe
Term Contract
Results
$150,000 to $200,000 est. value
CO

Reunion Center Stead School Phase District: Reunion Center Metropolitan District No 1
Results
Commerce City, CO 80022

112th and Irma Drive Drainage Improvements
Results
$200,000 to $300,000 est. value
Northglenn, CO 80233

48th Avenue Grading Project
Infrastructure
Bidding
Aurora, CO

Quincy Reservoir Improvements, Package C - Aeration System
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
Aurora, CO

2021 Miscellaneouse Drainage Improvements
Infrastructure
Bidding
Federal Heights, CO 80260

South Platte Bank Stabilization
Results
$1,830,000 to $2,200,000 est. value
Aurora, CO

CM/GC Services for 2021-2024 Rampart 54" PCCP Sliplining Rehabiliation Progam
Post-Bid
Aurora, CO

Reported 08/18/2021 12:00 AM
Project Title

High Point PD1 Pond Project

Physical Address View project details and contacts
City, State (County) Denver, CO   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A description of the Work to be performed is: Constructing a pond with mass grading of open land consisting of approximately 121,000 Cubic Yards of unclassified excavation complete in place, associated erosion control measures, installation of two Forebays, one Sediment Basin, one Pond Outlet Structure, 100 LF of Riser Pipe with 3x5 Type M Riprap Apron, approximately 4,700SY of Maintenance Access Path, approximately 1,200SY of Concrete Trickle Channel, approximately 6,500 SY of Erosion Control Blanket, Seeding, and Mulching.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents