Similar Projects
Park Sprayground
Renovation
Bidding
NE 68107

Construction Management at Risk (CMR) Services - Central Park Pavilion and Site Improvements
New Construction
Post-Bid
La Vista, NE 68128

MPS - Norris Elementary Playground Improvements
Renovation
Post-Bid
Omaha, NE 68137

Adams Park Green Infrastructure 2021
Infrastructure
Results
Omaha, NE

Fontenelle Park Green Infrastructure 2021 Maintenance
Infrastructure
Results
Omaha, NE 68104

Gering School Tennis Courts
Renovation
Pending Verification
Gering, NE

Island Oasis Park Upgrades
Renovation, Alteration
Pending Verification
Grand Island, NE

Disney Elementary Swings Improvements
Renovation
Post-Bid
Omaha, NE 68137

Hitchcock Park Green Infrastructure 2021
Renovation
Results
Omaha, NE

New Stolley Park Playground
New Construction
Post-Bid
Grand Island, NE 68803

Recreation Center Track Resurface
Infrastructure
Results
Less than $200,000 est. value
Wayne, NE

Hillsborough Park Splash Pad
New Construction
Post-Bid
Omaha, NE 68164

Brown Park Renovation
Renovation
Results
Omaha, NE 68102

Community Fieldhouse Indoor Playground
New Construction
Results
Grand Island, NE 68803

Mission Park West Playground Renovation
Renovation
Results
Omaha, NE 68135

Last Updated 12/27/2021 12:25 PM
Project Title

Offutt AFB Tennis Court Resurface

Physical Address View project details and contacts
City, State (County) Offutt Air Force Base, NE   (Sarpy County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This requirement is to install an overlay on two (2) tennis court surfaces with the following specifications. The provided items shall meet or exceed the following requirements: 1. Contractor will prepare existing tennis courts (56’ wide X 117’ long or 6,440 Net Ft total area for both courts) to receive an interior rubberized surface overlay (or equal). 2. Contractor will furnish and install overlay flooring. Material to be (2) colors from manufacturer’s standard color line. 3. Contractor will include painted game lines for two (2) Tennis Courts. 4. Contractor is required to dispose of all debris off-site. 5. Contractor will use only chemicals and materials discussed and annotated in bid.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents