Similar Projects
Eisenhower Interchange
Infrastructure
Design
$233,788,900 est. value
PA

2022 Paving Project
Infrastructure
Bidding
$150,000 to $170,000 est. value
Paxtang, PA 17111

2022 Paving Project
Infrastructure
Bidding
$800,000 to $1,100,000 est. value
PA

Asphalt Resurfacing and Bus Shelter Installation
Post-Bid
PA

Paving Bid
Post-Bid
Halifax, PA

Multiple Base Repair Locations on Saint Johns Road
Results
Millersburg, PA 17061

Road Base Repair and Paving Work
Results
Dauphin, PA 17018

The Hershey West End Project
Infrastructure
Construction
Hummelstown, PA 17036

23NW SGL 24 Judges Road
Infrastructure
Bidding
$2,000,000 est. value
Harrisburg, PA

Sealcoat Bid
Post-Bid
Halifax, PA 17032

Roadway and Miscellaneous Repairs
Results

SR 3015 (Progress Avenue) and T-491 (Paxton Church Road) Intersection Improvements
Infrastructure
Bidding
$400,000 est. value
Harrisburg, PA 17110

Road Projects
Infrastructure
Post-Bid
Elizabethville, PA

Road Base Repair
Results
Dauphin, PA 17112

Double Seal Coat and Fog Seal
Infrastructure
Post-Bid
Lykens, PA

Reported 06/21/2022 02:46 PM
Project Title

I-83 East Shore Section 3B

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17120   (Dauphin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $86,998,899
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Harrisburg, Pennsylvania. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. I-83 from SR 0230 (Cameron Sreet) to about 1500 ft west of SR 3013 (29th Street) overpass; and the along SR 3010 (Paxton Street) and 17th Street corridors in Harrisburg City and Swatara Township Dauphin County. Primary Improvement Type: Reconstruct As of June 20, 2022, the project is Future development stage. Anticipated letting date is October 10, 2024. PennDOT - I-83 East Shore Section 3B *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents