Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Sanitary Sewer Capacity Upgrades And Pump Station Rehabilitation - WTS044 - City of Novi
Renovation, Infrastructure
Conception
$2,405,350 est. value
Novi, MI

Bebb Oak Meadows Mixed-Use
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Rochester Hills, MI 48307

North Main Street Mixed-Use Building
Demolition, New Construction, Infrastructure - 31,680 SF
Design
$19,000,000 CJ est. value
Royal Oak, MI 48067

RFP Construction Manager - Construction Management Services for the Expansion and Renovation of Library
Addition, Demolition, Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Birmingham, MI 48009

Lockdale Pump Station Rehabilitation
Infrastructure
Bidding
$325,000 CJ est. value
Southfield, MI 48034

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Novi Pump Station Rehabilitation (Drakes Bay And Wixom Rd)
Renovation
Results
Novi, MI

Replacement Sump Pumps At Townsend Towers
Renovation
Results
Dearborn, MI

La Salette Multi-Family Development - The Ivy
Infrastructure, Renovation - 22,923 SF
Construction
$5,000,000 CJ est. value
Berkley, MI 48072

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Pedestrian Tunnel Replacement (underneath South Lakeshore Drive) - Lakeshore Park - ENG084 - City of Novi
Alteration
Conception
$507,530 est. value
Novi, MI 48377

Ford Road Plaza
New Construction, Infrastructure - 9,237 SF
Design
$2,500,000 CJ est. value
Garden City, MI 48135

Last Updated 10/06/2022 10:07 AM
Project Title

North Service Center Pumping Station Improvements - Great Lakes Water Authority

Physical Address View project details and contacts
City, State (County) West Bloomfield, MI 48323   (Oakland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2026 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $72,216,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 4, 2022, an engineer has been selected for the project. Although a firm timeline for construction has not been determined, per the owner's capital improvement plan (CIP), construction is not ex pected to start prior to late 2026. *The closed solicitation has been included below for reference: Professional engineering services related to the construction of a new North Service Center Booster pump house, new flow regulating valves, two (2) above grade ten (10) million gallon (MG), reservoirs, demolition and disposal of the existing main pump house, and associated yard piping and site-related improvements. Questions Due Date: Nov 23rd 2021, 12:00 PM EST The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents