Similar Projects
Egress and Food Safety Improvements of the GATE Center
Alteration
Post-Bid
Independence, VA 24348

Stone Work Whispering Wall
Term Contract
Post-Bid
Less than $250,000 est. value
Charlottesville, VA

Furnish, Deliver, Install Demountable Walls at Fine Art Center
Results
Newport News, VA

LED Theatre Lighting Fixtures - The Alden Theater
Results
McLean, VA

Construction of Casework / Locker Removal
Alteration
Post-Bid
Less than $100,000 est. value
Keswick, VA

Acoustical Panels
Alteration
Results
Norfolk, VA

Classroom Casework
Alteration
Post-Bid
Newport News, VA

Headquarters Water Damage Repairs
Alteration
Results
Charlottesville, VA

Insulation Installation Services
Alteration
Results
Roanoke, VA

Magnolia Grange Plaster Repairs
Alteration
Results
Chesterfield, VA 23832

Installation of Safety Rails - Jrb
Alteration
Results

Replacement of Lighting and Ceilings at Godwin High School
Alteration
Results
Richmond, VA 23238

Flammable Cabinets Installation
Alteration
Results
Less than $11,725 est. value
Sterling, VA 20164

Flooring and Countertops for Roanoke County/Salem Jail
Renovation, Alteration - 15,400 SF
Results
$200,000 est. value
Salem, VA 24153

Reported 06/29/2022 12:00 AM
Project Title

Replacing Restroom Fixtures in Ten (10) of the County Schools

Physical Address View project details and contacts
City, State (County) Accomac, VA   (Accomack County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK Furnish all materials, labor, equipment, and supervision require to install touch-free restroom fixtures in the following ten (10) County Schools: Accawmacke Elementary, Arcadia High, Arcadia Middle, Chincoteague Elementary, Chincoteague High, Kegotank Elementary, Metompkin Elementary, Nandua High, Nandua Middle, and Pungoteague Elementary. The approximate number of fixtures to be replaced are as follows: 319 Closet Flush Valves, 93 Urinal Flush Valves, and 282 Deck Mount Faucets. Bids should be based on these numbers, but will need to be verified by contractor that is awarded the job, at that time if numbers increase or decrease there will be a per unit cost adjustment. Bids should include a pre-unit cost, and a total project cost. This work will need to be scheduled and completed during the summer either 2022 or 2023, and all restrooms will need to be fully functional by the start of the school Session 2023.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents