Similar Projects
Last Updated | 06/30/2020 11:25 AM |
Project Title | Long Wharf Seawall Stabilization |
Physical Address | View project details and contacts |
City, State (County) | Boston, MA 02110 (Suffolk County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $819,350 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of new steel sheet pile over 189- linear feet length as close as possible to the toe of the existing granite block wall; Capping the new sheet pile bulkhead with a 4-wide concrete cap and fill the area between the new and existing walls with a flow-able concrete fill. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |