Similar Projects
Raleigh Green Stormwater Infrastructure Retrofits
Post-Bid
Less than $600,000 est. value
Raleigh, NC 27602

Stormwater Drainage Assistance - Chapel Hill Road Drainage Improvements
Post-Bid
Less than $317,000 est. value
Raleigh, NC 27607

Drysdale Drive Extension
Results
NC

Orange High School Athletic Improvements and Pathways Elementary Drainage
Results
Hillsborough, NC 27278

Pathways Elementary School Exterior Drainage
Post-Bid
Hillsborough, NC 27278

Historic Courthouse Drainage and Waterproofing
Results
Statesville, NC 28677

Streambank Repairs (Formal)
Post-Bid
Raleigh, NC

Historic Stewart Creek Stream Enhancement Phase II
Results
Charlotte, NC 28202

Lower Little Sugar Creek Greenway Polk Historic Site to the Sugar Creek State Line
Post-Bid
Charlotte, NC

CVCC Stream Bank Repair
Results
Hickory, NC 28602

Nix Road and Sunset Drive Roadway and Slope Repairs
Post-Bid
Marshall, NC 28753

New Bridge Street Outfall
Results
Jacksonville, NC 28541

Elm Street Drainage Project
Post-Bid
Nashville, NC 27856

Stream Bank Repairs
Results
Raleigh, NC 27601

Concrete Pipe
Post-Bid
Winston-Salem, NC 27102

Last Updated 03/07/2022 10:33 AM
Project Title

Arboretum Stream Restoration

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract consists of furnishing all labor, materials, equipment, and performing all work necessary and incidental to the installation of the stream restoration, enhancement, or stabilization work in and along a 2,200 foot section of North Buffalo Creek, including the following: stream channel bank grading; installation of bank stabilization practices; in-stream structure placement; removal and proper disposal of all excess material from the project area at an appropriate approved disposal site; furnishing and planting live plant materials in-stream and throughout the floodplain; erosion control installation, seeding and mulching; and tree removal as described in the Specifications and shown on the Drawings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents