Similar Projects
175 Park Avenue Mixed Use Development
New Construction - 2,143,000 SF
Conception
$10,000,000 CJ est. value
New York, NY 10017

Affirmation Tower
New Construction
Conception
New York, NY 10018

Commercial Building
New Construction - 7,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clarence, NY 14051

Madison Avenue Skyscraper
New Construction - 754,120 SF
Design
$10,000,000 CJ est. value
New York, NY

Former IGA Building Renovations
Renovation - 10,842 SF
Bidding
Akwesasne, NY 13655

Remediation Chemical Purchase and In-Situ Application Design at LNA
Renovation
Post-Bid

Remediation Chemical Purchase and In-Situ Application Design at LNA
Renovation
Post-Bid

Relocation and Renovation of Recruiting Office
Renovation
Results
Schenectady, NY 12302

Dog Control Facility
New Construction
Results
Less than $350,000 est. value
Lancaster, NY 14086

Jefferson Rehabilitation Center
Renovation - 36,000 SF
Construction
$11,000,000 est. value
Watertown, NY 13610

Construction of Rosamond Gifford Zoo Animal Health Center 2
Construction
Syracuse, NY 13202

Wildflower Studios
New Construction
Pending Verification
Astoria, NY

Riverhead Town Square
Renovation
Pending Verification
Riverhead, NY 11901

Office Building At Riverhill Center
New Construction, Renovation, Demolition - 107 SF
Conception
Less than $500,000 CJ est. value
Colonie, NY

Aebly Insurance
New Construction - 6,178 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Seneca, NY 14220

Last Updated 04/12/2022 04:36 PM
Project Title

Citiva Cultivation Facilty

Physical Address View project details and contacts
City, State (County) Warwick, NY 10990   (Orange County)
Category(s) Animal/Plant/Fish Facility, Commercial
Sub-Category(s) Animal/Plant/Fish Facility, Office
Contracting Method General Contractor to Subcontract.
Project Status Delayed due to COVID-19, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase I - 20,000 SF office & process building, 20,000 SF growing area Phase II & III - 40,000 SF growing area

Details

40,000 SF - Office, 20,000 SF New Construction, Animal/Plant/Fish Facility, 20,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents