Similar Projects
ONO Island CET Rehabilitation
Post-Bid
Orange Beach, AL 36561

Webster Ford Road Water Tank Rehabilitation
Post-Bid
Tallassee, AL 36078

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Three Mile Creek Severe Weather Attenuation Tanks
Construction
Less than $17,207,000 est. value
Mobile, AL

Water System Improvements - Water Tank Renovations and Water Meter Replacements
Post-Bid
Less than $500,000 est. value
Clio, AL 36017

World-Wide Water Storage Tank Remediation
Term Contract
Results

Contract LWA3-20 Elevated Water Storage Tank
Post-Bid
Loachapoka, AL 36865

Rehabilitation of 150,000 Water Storage Tank Contract No. 1
Results
$250,000 est. value
Pisgah, AL 35765

MBUSI Water Improvements Project Proposal B Storage Tank
Post-Bid
$900,000 to $1,500,000 est. value
Centreville, AL

Water Storage Tank Rehabilitation - Daleville Avenue Tank
Results
Enterprise, AL

Tank Repainting
Post-Bid
$350,000 est. value
Brewton, AL

Campus Area Water Distribution System and Instrumentation Upgrades - Proposal "B" - Elevated Water Storage Tank
Results
Less than $3,297,000 est. value
Tuscaloosa, AL 35403

Water System Improvements
Post-Bid
$702,399 est. value
Lowndesboro, AL

New Bypass Elevated Water Storage Tank
Results
Enterprise, AL 36330

Reported 01/05/2022 03:00 PM
Project Title

Water Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) Huntsville, AL   (Madison County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $360,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the rehabilitation/painting of Huntsville Utilities’ College Hill water tank. The contractor shall furnish all supervision, labor, materials, supplies, tools, equipment and transportation necessary to perform the Water Tank Rehabilitation called for under this contract in a timely, safe, and professional manner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents