Similar Projects
River Road Rehabilitation -3269- Rockland County
Infrastructure
Conception
$11,700,000 est. value
Stony Point, NY 10980

Olympic Drive Warehouse Addition
New Construction, Infrastructure - 35,400 SF
Conception
$4,000,000 CJ est. value
Orangeburg, NY 10962

Construction of a Parking Lot and Service Area
Alteration
Design
Tomkins Cove, NY 10986

Taco Bell / Nyack
Demolition, New Construction, Infrastructure
Design
$700,000 CJ est. value
Nyack, NY 10960

Bronico-Madison-Rowan Curbs/Sidewalk Replacement
Infrastructure
Bidding
$200,000 CJ est. value
West Haverstraw, NY 10993

Bronico-Madison-Rowan Curbs/Sidewalk Replacement
Infrastructure
Bidding
$200,000 CJ est. value
West Haverstraw, NY 10993

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

LiDL #1456 / Tappan
Demolition, New Construction, Infrastructure - 25,677 SF
Post-Bid
$6,700,000 CJ est. value
Tappan, NY 10983

Reconstruction of River Road
Results
NY

Cold Milling Operations
Infrastructure
Results
NY

Extra Space Storage - Site Work
New Construction
Construction
$5,000,000 to $10,000,000 CJ est. value
Pearl River, NY 10965

Thruway Plaza
Demolition, New Construction, Infrastructure - 86,928 SF
Construction
$20,000,000 CJ est. value
Nanuet, NY 10954

Orangeburg General Auto Repairs
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Orangeburg, NY 10962

Orangeburg General Auto Repairs
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Orangeburg, NY 10962

Talmud Torah Bnei Zion Addition
New Construction, Infrastructure - 36,360 SF
Conception
$10,000,000 CJ est. value
Monsey, NY 10952

Last Updated 01/19/2023 04:05 PM
Project Title

Intersection Improvements Maple Avenue and Union Village of Spring Valley

Physical Address View project details and contacts
City, State (County) Spring Valley, NY 10977   (Rockland County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The principal feature of the proposed work is to formalize the interim intersection bump-outs with new curbing, sidewalk, and pedestrian ramps. Also included is the complete replacement of the existing traffic signal including pedestrian actuated signals, vehicular detection, pavement milling, resurfacing, and pavement markings. Buyers Requirements General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - FOB Destination - Insurance Required - Local Service Required - Onsite Maintenance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Bid Intent Optional Bid Intent Deadline 01/05/2023 12:00 PM EST Question Acceptance Deadline 01/09/2023 03:00 PM EST Questions are submitted online No If the Contractor is delayed in completion of the work, or phases of the work, under this Contract by any act or neglect of the Owner or of any other Contractor employed by the Owner, or by changes in the work, or by any priority or allocation order duly issued by the Federal government, or by any unforeseeable cause beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God or of the public enemy, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormally severe weather, or by delays of subcontractors or suppliers occasioned by any of the causes described above, or by a delay authorized by the Village for any cause which the Village shall deem justifiable, then: For each day of delay in the completion of the work or a phase of the work so caused, the Contractor will be allowed one day additional to the time limitation specified in the Contract, it being understood and agreed that the allowance of same shall be solely at the discretion and approval of the Village. No such extension of time will be made for any delay unless the Contractor, within three (3) calendar days after the beginning of the delay, shall have informed the Village in writing of the nature of the delay, its cause, and its estimated duration. The Village will ascertain the facts regarding the delay and notify the Contractor within a reasonable time of his decision in the matter. The Contractor shall use all honorable and reasonable means to prevent or settle strikes, to avoid violations of labor agreements or other actions calculated to create dissatisfaction with working conditions. Should strikes occur, the Contractor shall make all proper and reasonable efforts to effect early settlement and resumption of the work. Should collusion by the Contractor be proven in the case of strikes or lockouts, then no extension of time for completion of the Contract will be given. Burden of proof in this case shall rest entirely with the Contractor.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents