Similar Projects
Overhead Garage Doors at Lasalle Ramp
Alteration
Post-Bid
Minneapolis, MN 55403

Window Replacements
Alteration
Post-Bid
Rogers, MN 55374

Civic Plaza Entry Doors Replacement and Repairs
Results
Bloomington, MN 55431

2021 Public Safety and Card Access Modifications
Infrastructure, Alteration
Results
$1,194,979 est. value
Minneapolis, MN 55450

2022-23 Gleason Lake Elementary School Window Replacement
Alteration
Post-Bid
Plymouth, MN 55447

ECC 2022 Window Replacement
Alteration
Results
Edina, MN

Anthony Safe and Welcoming Entry and Miscellaneous Upgrades
Renovation, Alteration
Post-Bid
Minneapolis, MN 55419

Concord ES 2022 Window Replacement
Alteration
Results
Edina, MN 55424

Boynton Brick Repair, Tuck Pointing, and Window Replacement
Renovation, Alteration
Post-Bid
Minneapolis, MN 55455

Nellie Stone Johnson Elementary School - Safe and Welcoming Entry
Renovation, Alteration
Results
Minneapolis, MN 55411

2022 Eden Prairie Garage (EPG) Garage Door Replacement
Alteration
Post-Bid
$40,000 est. value
Eden Prairie, MN 55346

Valley View Middle School 2022 Door Replacement
Alteration
Results
Edina, MN 55439

Design - Boynton Brick Repair, Tuck Pointing, and Window Replacement
Alteration
Post-Bid
$3,200,000 est. value
Minneapolis, MN 55455

Heywood Interior Garage Door and Fuel Piping Added Bracing
Alteration
Results
Minneapolis, MN 55405

Hennepin Avenue Ramp Pedestrian Door Replacement
Alteration
Post-Bid
$680,000 est. value
Minneapolis, MN

Last Updated 11/16/2022 12:04 PM
Project Title

St. Anthony Middle School/High School Window Replacement

Physical Address View project details and contacts
City, State (County) Saint Anthony, MN 55418   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: Partial building window system replacement, composite metal panels and modifications to existing exterior openings. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Independent School District #282 in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before August 18, 2023.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents