Similar Projects
New Ramah Navajo Senior Citizens Center - 30551 - Ramah Navajo Chapter
New Construction, Infrastructure - 4,000 SF
Conception
$6,180,000 CJ est. value
Ramah, NM 87321

Coal Avenue Commons Construction - 33173 - City of Gallup
Infrastructure
Conception
$2,677,000 CJ est. value
Gallup, NM 87301

Constructing a Track and Field at Bureau of Indian Education (BIE)
Infrastructure
Design
$600,000 CJ est. value
Crownpoint, NM 87313

AutoZone #9235 / Gallup
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Gallup, NM 87301

P21-001 Twin Buttes HS
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Zuni, NM 87327

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Bridge Replacement, Roadway Reconstruction, Lighting, ITS
New Construction, Infrastructure
Results
$3,000,000 est. value
Church Rock, NM 87311

Bridge Replacement, Roadway Reconstruction/Rehabilitation
Demolition, New Construction, Infrastructure
Results
$12,483,667 CJ est. value
Church Rock, NM 87311

Escalante Solar
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Prewitt, NM 87045

West Logan Avenue Improvements - 37222 - City of Gallup
Infrastructure
Conception
$825,000 CJ est. value
Gallup, NM 87301

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

McKinley County Detention Center - 35261 - McKinley County
New Construction, Infrastructure
Conception
$52,000,000 CJ est. value
Gallup, NM 87301

Maloney Avenue Sewer Line Extension
Infrastructure
Post-Bid
$200,000 CJ est. value
Gallup, NM 87301

Iyanbito Chapter New Waterline Projects - 39346 - Navajo Tribal Utility Authority
Infrastructure
Conception
$12,490,000 CJ est. value
Fort Wingate, NM 87316

Last Updated 09/14/2023 06:10 PM
Project Title

Aztec Avenue Alley 2nd & 3rd Street Surface & Drainage Improvements

Physical Address View project details and contacts
City, State (County) Gallup, NM 87301   (McKinley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of 9/14/2023 no bids were received for this project this will be rebid at a later date. Work for this project will be located in the alleyway between Coal Avenue and Aztec Avenue from 2nd Street west to 3rd Street. Work on the project will include the removal of the existing driving surface and replaced with improved drainage surface. Work includes a road profile surface consisting of geogrid, concrete, sand bedding and brick. Additional work shall include a trench drain system with tie-in to existing culverts, existing meter cans, manhole collars and telecommunication covers, bollard protection and roof drain outlets. BID GUARANTY: A COPY of bid bond shall be submitted electronically with the bid and made payable to the owner in the amount of five percent (5%) of the bid sum. NOTE: Original form of bid bond shall immediately be mailed to owner once bid proposal is determined low, responsive bid. Security shall be by a certified or cashier's check or a bid bond prepared on a form acceptable to the owner, issued by a surety licensed to do business in the state where the project is located. The owner will retain these securities until a contract has been entered into. The bidder shall file the surety bonds and enter into a contract for the work within 15 days after notice of award of the contract. Should the lowest bidder refuse to enter into a contract, the owner will retain their security as liquidated damages, not as a penalty. If the lowest bidder fails to enter into a contract, then the next lowest bidder will be considered as the lowest bidder. The Contractor shall furnish a Performance Bond and a Payment Bond each in 100% of the contract amount. The Performance Bond shall also provide for a 1 year guarantee for materials and workmanship once contractor is considered substantially complete. TIME OF COMPLETION: The Bidder must agree to commence work on a date to be specified in a written "Notice to Proceed" issued by the Owner or his representatives and to fully complete the project within ONE HUNDRED (100) consecutive calendar days thereafter, including weather delays Question & Answer deadline Jul 18, 2023 (Tue), 5:00 PM Please submit all questions within Mercell Source-to-Contract in the Question & Answer tab

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents