Similar Projects
Add Alternate Water Distribution System
Infrastructure
Design
$1,000,000 CJ est. value
Jackson, MS 39232

Add Alternate Water Distribution System
Infrastructure
Design
$1,000,000 CJ est. value
Jackson, MS 39232

Milling and Overlay of Old Fannin Road
Infrastructure
Bidding
$4,000,000 CJ est. value
Brandon, MS 39047

Hwy 471 Sewer Line Extension
Infrastructure
Bidding
$400,000 CJ est. value
Brandon, MS 39042

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

College Street Waterline Replacement Project
Infrastructure
Post-Bid
Brandon, MS 39042

2022 Brenmar Street Waterline Extension Project
Infrastructure
Results
Brandon, MS 39042

2020 Water System Improvements
Infrastructure
Results
$200,000 est. value
Pelahatchie, MS

Mill Creek Bank Stabilization
Infrastructure
Construction
$1,727,336 CJ est. value
Brandon, MS 39047

Menasha Packaging Expansion
Addition, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Pelahatchie, MS 39145

Utility Water Meter Project
Infrastructure
Post-Bid
Pearl, MS

Traffic Signal @ East Metro Parkway And Town Center Way
Infrastructure
Results
$319,131 CJ est. value
Flowood, MS 39232

Rehabilitate Taxiway A, Phase 2 and Rehabilitate Taxiway B, Phase 1 at the Jackson-Medgar Wiley Evers International Airport
Infrastructure
Post-Bid
$525,000 CJ est. value
Jackson, MS 39208

Muse Center Sign Renovations (Rankin Campus)
Infrastructure
Results
$190,040 CJ est. value
Pearl, MS 39208

Construction of 10.656 Miles of Overlay
Infrastructure
Post-Bid
$250,000 CJ est. value
Brandon, MS 39042

Last Updated 08/06/2023 12:21 AM
Project Title

Mar Lyn Drive Water Line Improvements

Physical Address View project details and contacts
City, State (County) Brandon, MS 39042   (Rankin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $59,502 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

supplying all labor, equipment, and materials necessary for completion of the Mar Lyn Water Line Improvements. Bidders must be qualified under Mississippi State Law and show a Certificate of Responsibility issued by the Mississippi State Board of Public Contractors. Bid Security in the amount of 5% of the bid must accompany each bid in accordance with the Instructions to bidders. Attorneys-in-fact who sign Bid Bonds, Payment Bonds or Performance Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. Minority and Woman Owned Business Enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities, equipment, material and/or supply needs. The City of Brandon is an Equal Opportunity Employer, and hereby notifies all bidders will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other legally protected status in consideration for an award. No prospective CONTRACTOR may withdraw his proposal within SIXTY (60) DAYS after the actual date of the opening thereof. Each bidder shall write the Certificate of Responsibility number and Mississippi Contractors License number on the outside of the sealed envelope containing his proposal. Proposals shall be submitted in duplicate, sealed, and deposited with the City Clerk prior to the hour and date designated above. Bid Number 2023-10 should be marked in the lower left corner of the envelope. The City of brandon reserves the right to waive any information or irregularities, to accept any bid deemed to be in the best interest of the City, or to reject any or all bids. The Contract Time is Forty-five (45) consecutive calendar days with liquidated damages being Five Hundred Dollars ($500) per calendar day thereafter. Projectscope includes, but is not limited to, the installation of 840 linear feet of 8" C-900 waterline, 40 linear feet of 8" I.D. HDPE DR-11 water main (directional bore), connection to existing water mains (cold cut) at four locations, installation of three 8" gate valves, installation of flowable fill to 320 linear feet of existing 8" water main, the capping of the existing water main and all other associated work required to complete all as shown and specified in the plans and contract documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents