Similar Projects
Rhode Island Nurses Institute Middle College
Design
$500,000 est. value
Providence, RI 02900

Refrigeration System and HVAC Preventative Maintenance Service
Term Contract
Sub-Bidding
West Warwick, RI 02893

Duct Cleaning Services Rebid
Term Contract
Sub-Bidding
Westerly, RI 02891

Rhode Island State Beach Cleaning Statewide Locations
Term Contract
Post-Bid

Rhode Island State Beach Cleaning Statewide Locations
Term Contract
Post-Bid

Ryan Institute Lab Renovation - Phase 1
Renovation
Results
South Kingstown, RI 02881

Ryan Institute Lab Renovations - Phase 2
Renovation
Results
$2,068,000 est. value
Kingston, RI 02881

Design-Bid-Build, Repair B3 Mahan Hall, Naval War College
New Construction, Renovation, Demolition - 28,480 SF
Construction
Newport, RI 02841

Inlet Stones 22-23
Term Contract
Sub-Bidding
Providence, RI 02903

Pest Control Services
Post-Bid
Providence, RI

Owner`s Program Manager - Clarke Science Renovations at Rhode Island College
Renovation
Results
$38,000,000 est. value
Providence, RI

Street Tree Planting Fall 2022
Term Contract
Sub-Bidding
Providence, RI 02903

Window Cleaning
Post-Bid
Providence, RI

PCM - Phase 1 - Clarke Science Renovations at Rhode Island College
Renovation
Results
North Providence, RI 02908

Sodium Chloride 22-23
Term Contract
Sub-Bidding
Providence, RI 02903

Last Updated 08/12/2022 06:04 AM
Project Title

Gym Equipment Maintenance

Physical Address View project details and contacts
City, State (County) Warwick, RI 02889   (Kent County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions May Be Emailed to the Purchasing Office at Purchasing@ccri.edu by Friday, August 26, 2022 at 10:00AM. Pre-bid Conference: No Offers are irrevocable for sixty (60) days from the opening date (or such other extended period set forth in the solicitation), and may not be withdrawn, except with the express permission of the College Purchasing Agent. All pricing will be considered to be firm and fixed unless otherwise indicated. All offers must define delivery dates for all items; if no delivery date is specified, it is assumed that immediate delivery from stock will be made. After an award has been made, failure to meet all requirements of this invitation may result in a determination of default. Payments for partial delivery will not be made, except where expressly provided herein. Unless specified "no substitute," product offerings equivalent in quality and performance will be considered (at the sole option of the College) on the condition that the offer is accompanied by detailed product specifications. The College reserves the right to (a) make awards on the basis that best serves the interest of CCRI, individual items, total low, etc., and (b) reject any and all bids in whole or in part. Prices quoted are N30, FOB DESTINATION, less federal/state tax. VENDOR AUTHORIZATION TO PROCEED. When a purchase order or change order is issued by the Community College of Rhode Island, no claim for payment for services rendered or goods delivered contrary to or in excess of the contract terms and scope shall be considered valid unless the vendor has obtained a written change order issued by the Community College of Rhode Island PRIOR TO delivery. Any offer, whether in response to a solicitation for proposals or bids, or made without a solicitation, which is accepted in the form of a purchase order made in writing by the Purchasing Agent, or a state official with purchasing authority delegated by the Purchasing Agent, shall be considered a binding contract. Where bid surety is required, bidder must furnish a bid bond or certified check for 5% of the bid total with the bid, or for such other amount as may be specified. Where indicated, successful bidder must furnish a 100% performance bond and labor and payment bond for contracts subject to Title 37 Chapters 12 and 13 of the Rhode Island General Laws. All bonds must be furnished by a surety company authorized to conduct business in the State of Rhode Island. This solicitation and any contract or purchase order arising from it is issued in accordance with the specific requirements described herein, and the State's Purchasing Laws and Regulations and other applicable State Laws, including the Board of Governors for Higher Education General Terms and Conditions of Purchase. Offerors are advised that all materials submitted to the College for consideration in response to this solicitation will be considered without exception to be Public Records pursuant to Title 38 Chapter 2 of the Rhode Island General Laws, and will be released for inspection upon written request once an award has been made. Bidders are encouraged to attend Public Bid Openings to obtain competitive pricing information. Bid tabulations may be reviewed after award(s) have been made at the Community College of Rhode Island Purchasing Office Mondays through Fridays between the hours of 9:00 a.m. and 3:30 p.m. - telephone requests for bid results will not be honored. Provisions of State labor laws concerning payment of prevailing wage rates, issued by the R.I. Department of Labor and Training, shall apply for contracts involving public works construction, alteration, or building repair work. In accordance with Title 7 Chapter 1.1-99 of the Rhode Island General Laws, foreign corporations (a corporation established other than in Rhode Island) must be qualified to transact business in this state. State Equal Employment Opportunity Compliance certificate and agreement procedures will apply to all awards for supplies or services valued at $10,000 and more. Minority Business Enterprise policies and procedures, including subcontracting opportunities as described in Title 37 Chapter 14.1 of the Rhode Island General Laws, also apply. For further information, contact the State MBE Administrator at (401) 574-8253 or Dorinda.Keene@doa.ri.gov

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents