Similar Projects
CPS Ninos Heroes, Schmid, Stagg ES ADA Modifications
Renovation
Bidding
Chicago, IL 60617

CPS Hayt ES & Swift ES Pre-K
Renovation
Bidding
Chicago, IL 60660

Liberty Elementary Floor Renovation
Renovation
Post-Bid
Cicero, IL 60804

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Near West OSP Rudolph Renovations
Renovation
Results
Chicago, IL 60612

Lester Crawl Primary Center Structural Steel
Renovation, Addition
Results
Lansing, IL 60438

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

CPS Agassiz, Goethe, Salazar & Wells ADA Modifications
Bidding
Chicago, IL 60657

NCP Hibbard Elementary School
Post-Bid
Chicago, IL 60625

Hurley ES Pool
Results
Chicago, IL 60602

CPS Bass, Barton, Cook ADA Package 13
Bidding
Chicago, IL 60621

Kanoon 2021-29071-ROF / Polaris 2021-67081-ROF
Post-Bid
Less than $8,700,000 est. value
Chicago, IL 60623

Reinberg ES Pre-K Annex
Results
$3,000,000 to $5,000,000 est. value
Chicago, IL 60634

CPS Bouchet, Park Manor, Tanner, Powell Pre-K and ADA Upgrades
Renovation
Bidding
Chicago, IL 60649

ROF Norwood Park
Renovation
Post-Bid
Less than $4,000,000 est. value
Chicago, IL 60631

Reported 04/15/2021 12:00 AM
Project Title

STEAM Lab at Karel Havlicek ES

Physical Address View project details and contacts
City, State (County) Berwyn, IL 60402   (Cook County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of interior renovation work for two classrooms including select interior demolition, new interior drywall partitions and interior painting, flooring and wall base, casework, counters and sinks with new plumbing connections, new acoustic ceiling tiles systems and linear LED lighting and suspended LED lighting, new mechanical diffusers connected to existing routing, lighting controls, power, data, a/v, and exhaust fan with new roof penetration and curb.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents